The study of the economic and financing viability of the NPP APWR construction at Muria Peninsula have been done. This study is carried out with steps as follows: updating of newest NPP APWR technical and economic data, <br /> <br /> <br /> the calculation of electricity generati...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17161
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17161
spelling id-itb.:171612017-09-27T15:30:54Z#TITLE_ALTERNATIVE# (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17161 The study of the economic and financing viability of the NPP APWR construction at Muria Peninsula have been done. This study is carried out with steps as follows: updating of newest NPP APWR technical and economic data, <br /> <br /> <br /> the calculation of electricity generation cost, the calculation of construction cost, and calculation of NPP APWR financing viability by using feasibility criteria <br /> <br /> <br /> such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback Period. The result shows that the electricity generation cost is 3.91 cent/kWh. Total <br /> <br /> <br /> construction cost of NPP APWR is US$ 6,250 million (including interest and financial fee). The calculation of financing viability in base case obtained that value of IRR, NPV and Payback Period which viability for total investment is 7.73%, US$ 5,521.07 million and 12 years. From these results can be concluded that with the electricity tariff 6 cent/kWh or 60 US$/MWh, basically this project of NPP APWR development is feasible and <br /> <br /> <br /> beneficial. From investment side, this project can be attractive because the rate of capital return is high enough, profit in the end of economic life is big enough <br /> <br /> <br /> and payback period is short enough. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The study of the economic and financing viability of the NPP APWR construction at Muria Peninsula have been done. This study is carried out with steps as follows: updating of newest NPP APWR technical and economic data, <br /> <br /> <br /> the calculation of electricity generation cost, the calculation of construction cost, and calculation of NPP APWR financing viability by using feasibility criteria <br /> <br /> <br /> such as Net Present Value (NPV), Internal Rate of Return (IRR) and Payback Period. The result shows that the electricity generation cost is 3.91 cent/kWh. Total <br /> <br /> <br /> construction cost of NPP APWR is US$ 6,250 million (including interest and financial fee). The calculation of financing viability in base case obtained that value of IRR, NPV and Payback Period which viability for total investment is 7.73%, US$ 5,521.07 million and 12 years. From these results can be concluded that with the electricity tariff 6 cent/kWh or 60 US$/MWh, basically this project of NPP APWR development is feasible and <br /> <br /> <br /> beneficial. From investment side, this project can be attractive because the rate of capital return is high enough, profit in the end of economic life is big enough <br /> <br /> <br /> and payback period is short enough.
format Theses
author (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI
spellingShingle (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI
#TITLE_ALTERNATIVE#
author_facet (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI
author_sort (NIM : 29101370); Pembimbing: Dr. Ir. Herman Darnel Ibrahim, M.Sc., SANSUADI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/17161
_version_ 1820745546488348672