#TITLE_ALTERNATIVE#

The oil (gas) &#133;eld development consists of two subprocesses, drilling and production where is treated as sequential in nature. Drilling is perfomed from <br /> <br /> <br /> platform in which one can drill only one well at a time, while production has a production level...

Full description

Saved in:
Bibliographic Details
Main Author: PASMA HARYANI (NIM. 101 07 057); Pembimbing Tugas Akhir : Dr. Agus Yodi Gunawan, TASYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17377
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items