MODEL PENGGANTIAN SISTEM DENGAN MEMPERTIMBANGKAN GARANSI UNTUK HORIZON WAKTU TERBATAS
ABSTRACT <br /> Most systems (industrial equipments) are sold with warranty and, the warranty period offered tends to be longer. As a result, warranty can affect maintenance costs bourned by the users. Research that links preventive replacement with warranty are very few and all of those...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/1740 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |