MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN

The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br /> preventive mainte...

Full description

Saved in:
Bibliographic Details
Main Author: Agus Arlianto, Jerry
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1743
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:1743
spelling id-itb.:17432004-06-29T09:23:17ZMODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN Agus Arlianto, Jerry Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1743 The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br /> preventive maintenance activity is scheduled. <br /> In this thesis, we study m machine flow shop problems with due date constrains. The problem conciders that an unavailability interval occurs only at one of m machines. Since in the planning horizon for the shop floor scheduling is usually not too long, it is reasonable to assume that there is only one unavailable interval. <br /> We assume that if a job cannot be completed before the next unavailable period of a machine then the job will have to restart when <br /> the machine has become available again, it is called nonresumable conditions. We propose algoritms to solve the problem, and use some <br /> hipotetic cases to test the solutions. The resulting solutions are compared to the solutions obtained from the complete enumeration method and the comparisons show that the solutions are optimal. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br /> preventive maintenance activity is scheduled. <br /> In this thesis, we study m machine flow shop problems with due date constrains. The problem conciders that an unavailability interval occurs only at one of m machines. Since in the planning horizon for the shop floor scheduling is usually not too long, it is reasonable to assume that there is only one unavailable interval. <br /> We assume that if a job cannot be completed before the next unavailable period of a machine then the job will have to restart when <br /> the machine has become available again, it is called nonresumable conditions. We propose algoritms to solve the problem, and use some <br /> hipotetic cases to test the solutions. The resulting solutions are compared to the solutions obtained from the complete enumeration method and the comparisons show that the solutions are optimal.
format Theses
author Agus Arlianto, Jerry
spellingShingle Agus Arlianto, Jerry
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
author_facet Agus Arlianto, Jerry
author_sort Agus Arlianto, Jerry
title MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
title_short MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
title_full MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
title_fullStr MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
title_full_unstemmed MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
title_sort model penjadwalan pada sistem produksi shofdengan kendala interval ketidaktersediaan mesin
url https://digilib.itb.ac.id/gdl/view/1743
_version_ 1820663049057468416