MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN
The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br /> preventive mainte...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/1743 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:1743 |
---|---|
spelling |
id-itb.:17432004-06-29T09:23:17ZMODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN Agus Arlianto, Jerry Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1743 The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br /> preventive maintenance activity is scheduled. <br /> In this thesis, we study m machine flow shop problems with due date constrains. The problem conciders that an unavailability interval occurs only at one of m machines. Since in the planning horizon for the shop floor scheduling is usually not too long, it is reasonable to assume that there is only one unavailable interval. <br /> We assume that if a job cannot be completed before the next unavailable period of a machine then the job will have to restart when <br /> the machine has become available again, it is called nonresumable conditions. We propose algoritms to solve the problem, and use some <br /> hipotetic cases to test the solutions. The resulting solutions are compared to the solutions obtained from the complete enumeration method and the comparisons show that the solutions are optimal. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The majority of the scheduling literature assumes that machines are available all the time. However, this assumption may not be applicable in real world, since a machine may be unavailable during certain periods of time when, for instance, the machine breakdowns or a <br />
preventive maintenance activity is scheduled. <br />
In this thesis, we study m machine flow shop problems with due date constrains. The problem conciders that an unavailability interval occurs only at one of m machines. Since in the planning horizon for the shop floor scheduling is usually not too long, it is reasonable to assume that there is only one unavailable interval. <br />
We assume that if a job cannot be completed before the next unavailable period of a machine then the job will have to restart when <br />
the machine has become available again, it is called nonresumable conditions. We propose algoritms to solve the problem, and use some <br />
hipotetic cases to test the solutions. The resulting solutions are compared to the solutions obtained from the complete enumeration method and the comparisons show that the solutions are optimal. |
format |
Theses |
author |
Agus Arlianto, Jerry |
spellingShingle |
Agus Arlianto, Jerry MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
author_facet |
Agus Arlianto, Jerry |
author_sort |
Agus Arlianto, Jerry |
title |
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
title_short |
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
title_full |
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
title_fullStr |
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
title_full_unstemmed |
MODEL PENJADWALAN PADA SISTEM PRODUKSI SHOFDENGAN KENDALA INTERVAL KETIDAKTERSEDIAAN MESIN |
title_sort |
model penjadwalan pada sistem produksi shofdengan kendala interval ketidaktersediaan mesin |
url |
https://digilib.itb.ac.id/gdl/view/1743 |
_version_ |
1820663049057468416 |