#TITLE_ALTERNATIVE#
System contingency that happened on power system will result imbalance between power supply and demand. To prevent power interruption on demand side, power system operator will schedule operation of spinning reserve with expense that more expensive than energy operation. At conventional management o...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |