TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM

The need of electricity in Indonesia increases day by day, including the need of electricity in villages or remote areas where still lack of electricity. Development and implementation of Distributed Generation (DG) concept can be an obvious way to answer this problem. Microturbine power plant syste...

Full description

Saved in:
Bibliographic Details
Main Author: HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17652
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17652
spelling id-itb.:176522017-09-27T10:40:49ZTESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17652 The need of electricity in Indonesia increases day by day, including the need of electricity in villages or remote areas where still lack of electricity. Development and implementation of Distributed Generation (DG) concept can be an obvious way to answer this problem. Microturbine power plant system is a gas turbine system that can contribute to the implementation of DG. The most critical <br /> <br /> <br /> problem in this concept is the microturbine technology is still involving high investment cost. <br /> <br /> <br /> The concept of turbocharger based microturbine power plant system then can be a good choice since turbocharger are commercially produced in relatively low cost. A twin shaft turbocharger based microturbine power plant system has <br /> <br /> <br /> been developed implementing MHI TD05H and MHI TD08H turbochargers. In current research, two prototypes of a microturbine power plants were developed. <br /> <br /> <br /> The first prototype utilizes MHI TD05H turbocharger as a gas generator and also as a power turbine, meanwhile the second prototype used MHI TD05H turbocharger as a gas generator with turbocharger MHI TD08H as a power turbine. <br /> <br /> <br /> The performance test of the first prototype showed an unexpecting result, however the one of the second prototype gave a 104.52 W maximum power output at 0.06% efficiency. Further research for maximizing performance system of the second prototype need to be conducted in order to increase the values of maximum power output and efficiency. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The need of electricity in Indonesia increases day by day, including the need of electricity in villages or remote areas where still lack of electricity. Development and implementation of Distributed Generation (DG) concept can be an obvious way to answer this problem. Microturbine power plant system is a gas turbine system that can contribute to the implementation of DG. The most critical <br /> <br /> <br /> problem in this concept is the microturbine technology is still involving high investment cost. <br /> <br /> <br /> The concept of turbocharger based microturbine power plant system then can be a good choice since turbocharger are commercially produced in relatively low cost. A twin shaft turbocharger based microturbine power plant system has <br /> <br /> <br /> been developed implementing MHI TD05H and MHI TD08H turbochargers. In current research, two prototypes of a microturbine power plants were developed. <br /> <br /> <br /> The first prototype utilizes MHI TD05H turbocharger as a gas generator and also as a power turbine, meanwhile the second prototype used MHI TD05H turbocharger as a gas generator with turbocharger MHI TD08H as a power turbine. <br /> <br /> <br /> The performance test of the first prototype showed an unexpecting result, however the one of the second prototype gave a 104.52 W maximum power output at 0.06% efficiency. Further research for maximizing performance system of the second prototype need to be conducted in order to increase the values of maximum power output and efficiency.
format Final Project
author HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY
spellingShingle HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY
TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
author_facet HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY
author_sort HOCKIYANTO (NIM : 13105041); Pembimbing 1: Dr. Ir. T. A. Fauzi Soelaiman; Pembimbing 2 : Dr. I, YOPPY
title TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
title_short TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
title_full TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
title_fullStr TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
title_full_unstemmed TESTING OF MHI TD05H & MHI TD08H TURBOCHARGERS BASED MICROTURBINE POWER PLANT SYSTEM
title_sort testing of mhi td05h & mhi td08h turbochargers based microturbine power plant system
url https://digilib.itb.ac.id/gdl/view/17652
_version_ 1820745653340340224