DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG

One of the most influential parameter on the electrical generating capacity in the Combined Cycle Power Plant is the compressor inlet air temperature. In general, gas turbine manufacturers design the maximum electrical generating capacity at temperatures less than 200C of ambient air temperature. Co...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17728
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17728
spelling id-itb.:177282017-09-27T10:40:46ZDESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17728 One of the most influential parameter on the electrical generating capacity in the Combined Cycle Power Plant is the compressor inlet air temperature. In general, gas turbine manufacturers design the maximum electrical generating capacity at temperatures less than 200C of ambient air temperature. Combined Cycle Power Plant in Indonesia, almost all work on the condition of the average temperature of 300C because of Indonesia's tropical climate, so that the capacity obtained was not optimal. To maximize the generation capacity in PLTGU additional installation required to cool the air to be used in gas turbine cycle. <br /> <br /> <br /> An Inlet Air Cooling system have been designed for 1 unit of Gas Turbine Generator with a capacity of 260 MW with air volumetric rate of 530 m3/s and assuming the condition of environmental air at a dry bulb and wet bulb temperature of 300C and 260C. For extreme conditions, the system serves the cooling load of 2008 TR. <br /> <br /> <br /> Estimation of system performance during one year of operation had been carried out using temperature data PLTGU operation Muara Karang. From the estimation performance can be concluded that the cooling system is able to maximize electricity generation capacity by an additional net power ranging from 9.5 MW to 15.6 MW. The total investment cost for this system is Rp. 18.529.021.000,-. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One of the most influential parameter on the electrical generating capacity in the Combined Cycle Power Plant is the compressor inlet air temperature. In general, gas turbine manufacturers design the maximum electrical generating capacity at temperatures less than 200C of ambient air temperature. Combined Cycle Power Plant in Indonesia, almost all work on the condition of the average temperature of 300C because of Indonesia's tropical climate, so that the capacity obtained was not optimal. To maximize the generation capacity in PLTGU additional installation required to cool the air to be used in gas turbine cycle. <br /> <br /> <br /> An Inlet Air Cooling system have been designed for 1 unit of Gas Turbine Generator with a capacity of 260 MW with air volumetric rate of 530 m3/s and assuming the condition of environmental air at a dry bulb and wet bulb temperature of 300C and 260C. For extreme conditions, the system serves the cooling load of 2008 TR. <br /> <br /> <br /> Estimation of system performance during one year of operation had been carried out using temperature data PLTGU operation Muara Karang. From the estimation performance can be concluded that the cooling system is able to maximize electricity generation capacity by an additional net power ranging from 9.5 MW to 15.6 MW. The total investment cost for this system is Rp. 18.529.021.000,-.
format Final Project
author (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY
spellingShingle (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY
DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
author_facet (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY
author_sort (NIM : 13106100); Dosen Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, ZULFIKRY
title DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
title_short DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
title_full DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
title_fullStr DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
title_full_unstemmed DESIGN OF INLET AIR COOLING SYSTEM CASE STUDY: PLTGU MUARA KARANG
title_sort design of inlet air cooling system case study: pltgu muara karang
url https://digilib.itb.ac.id/gdl/view/17728
_version_ 1820745670022135808