ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP

ABSTRACT <br /> <br /> <br /> <br /> <br /> High-speed information technology has a very important role in the success and profitability of the industry today. Businesses such as financial services can not tolerate any risk that occurs caused by information techno...

Full description

Saved in:
Bibliographic Details
Main Author: PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17997
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17997
spelling id-itb.:179972017-09-27T15:30:40ZANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17997 ABSTRACT <br /> <br /> <br /> <br /> <br /> High-speed information technology has a very important role in the success and profitability of the industry today. Businesses such as financial services can not tolerate any risk that occurs caused by information technology. In this kind of business, Reliable IT infrastructure is strongly needed to support optimal performance. The alternate solution of those problems is the company should build their own Data Center to accommodate the need of highly reliable IT Technology. <br /> <br /> <br /> <br /> <br /> This Final Project purpose is to analyse business development of Data Center in east area of Indonesia. Business analysis consists of exploring market potential, technology aspect, risk analysis and also feasibility study using various indicators of financial feasibility including IRR, NPV and PBP, combined with Sensitivity Analysis. This project investment cost is Rp 434,982,600,000. After determine financial feasibility factors, it is result IRR 24% which higher than WACC (10.89%), Net Present <br /> <br /> <br /> Value amount is Rp 92,252,128,021 indicate positive value and payback period result is 6 years and 1 month. Based on result of financial analysis, Data Center project is feasible to be implemented with certain assumption related to equity support with <br /> <br /> <br /> Electricity Price is also an important factor that effecting Data Center project feasibility analysis. <br /> <br /> <br /> <br /> <br /> As the conclusion of financial analysis is feasible then the next step is developing implementation plan. The implementation steps of this project would focus on 2 main staging, which are business, and market staging and technical design staging. <br /> <br /> <br /> <br /> <br /> Keyword: Data Center, IRR, NPV, PBP, and Sensitivity Analysis. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT <br /> <br /> <br /> <br /> <br /> High-speed information technology has a very important role in the success and profitability of the industry today. Businesses such as financial services can not tolerate any risk that occurs caused by information technology. In this kind of business, Reliable IT infrastructure is strongly needed to support optimal performance. The alternate solution of those problems is the company should build their own Data Center to accommodate the need of highly reliable IT Technology. <br /> <br /> <br /> <br /> <br /> This Final Project purpose is to analyse business development of Data Center in east area of Indonesia. Business analysis consists of exploring market potential, technology aspect, risk analysis and also feasibility study using various indicators of financial feasibility including IRR, NPV and PBP, combined with Sensitivity Analysis. This project investment cost is Rp 434,982,600,000. After determine financial feasibility factors, it is result IRR 24% which higher than WACC (10.89%), Net Present <br /> <br /> <br /> Value amount is Rp 92,252,128,021 indicate positive value and payback period result is 6 years and 1 month. Based on result of financial analysis, Data Center project is feasible to be implemented with certain assumption related to equity support with <br /> <br /> <br /> Electricity Price is also an important factor that effecting Data Center project feasibility analysis. <br /> <br /> <br /> <br /> <br /> As the conclusion of financial analysis is feasible then the next step is developing implementation plan. The implementation steps of this project would focus on 2 main staging, which are business, and market staging and technical design staging. <br /> <br /> <br /> <br /> <br /> Keyword: Data Center, IRR, NPV, PBP, and Sensitivity Analysis.
format Theses
author PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA
spellingShingle PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA
ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
author_facet PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA
author_sort PUSPITASARI (NIM: 29110334); Final Project Counsellor: Erman Sumirat, SE, MBuss (Finance), Ak, ANITA
title ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
title_short ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
title_full ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
title_fullStr ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
title_full_unstemmed ANALISA PENGEMBANGAN BISNIS DATA CENTER DI WILAYAH TIMUR INDONESIA: STUDI KASUS PADA PROYEK INVESTASI GAMA GROUP
title_sort analisa pengembangan bisnis data center di wilayah timur indonesia: studi kasus pada proyek investasi gama group
url https://digilib.itb.ac.id/gdl/view/17997
_version_ 1820745752376246272