#TITLE_ALTERNATIVE#

Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br /> <br /> <br /> Study on the implementation of...

Full description

Saved in:
Bibliographic Details
Main Author: ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18109
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18109
spelling id-itb.:181092017-09-27T10:25:47Z#TITLE_ALTERNATIVE# ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18109 Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br /> <br /> <br /> Study on the implementation of Regional Building is carried out based on existing documents. In this study the things that will be studied include project organization, the tender process, schedule and cost planning, project implementation and execution of the contrac/agreement. The results will be evaluated according to applicable regulations. From the evaluation results are expected to provide input to the Regional Building. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br /> <br /> <br /> Study on the implementation of Regional Building is carried out based on existing documents. In this study the things that will be studied include project organization, the tender process, schedule and cost planning, project implementation and execution of the contrac/agreement. The results will be evaluated according to applicable regulations. From the evaluation results are expected to provide input to the Regional Building.
format Final Project
author ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA
spellingShingle ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA
#TITLE_ALTERNATIVE#
author_facet ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA
author_sort ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/18109
_version_ 1820745788131639296