#TITLE_ALTERNATIVE#
Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br /> <br /> <br /> Study on the implementation of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18109 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:18109 |
---|---|
spelling |
id-itb.:181092017-09-27T10:25:47Z#TITLE_ALTERNATIVE# ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18109 Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br /> <br /> <br /> Study on the implementation of Regional Building is carried out based on existing documents. In this study the things that will be studied include project organization, the tender process, schedule and cost planning, project implementation and execution of the contrac/agreement. The results will be evaluated according to applicable regulations. From the evaluation results are expected to provide input to the Regional Building. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Local Government Building is one of the development financed by the local government budget. Given the frequent occurrence of corruption in the use of budget, it is necessary to study the implementation of the Regional Building. <br />
<br />
<br />
Study on the implementation of Regional Building is carried out based on existing documents. In this study the things that will be studied include project organization, the tender process, schedule and cost planning, project implementation and execution of the contrac/agreement. The results will be evaluated according to applicable regulations. From the evaluation results are expected to provide input to the Regional Building. |
format |
Final Project |
author |
ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA |
spellingShingle |
ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA #TITLE_ALTERNATIVE# |
author_facet |
ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA |
author_sort |
ANSHARI HAKIM (NIM : 15007163); Dosen Pebimbing : Prof. Dr. Ir. Rizal Z. Tamin; Rani G. Kusuma, AULIA |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/18109 |
_version_ |
1820745788131639296 |