HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD

Instability of a slope will result in the collapse of the rock around the excavation site. For that reason a slope stability analysis is needed to anticipate the possibility of avalanches on the slopes, so that the sustainability of the mining process and the health and safety of both labor and equi...

Full description

Saved in:
Bibliographic Details
Main Author: INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18280
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18280
spelling id-itb.:182802017-09-27T10:39:05ZHIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18280 Instability of a slope will result in the collapse of the rock around the excavation site. For that reason a slope stability analysis is needed to anticipate the possibility of avalanches on the slopes, so that the sustainability of the mining process and the health and safety of both labor and equipment can be guaranteed. <br /> <br /> <br /> Lowwall slope stability analysis was conducted on a cross-section taken from Pit 8A, one pit mining in the East Block, PT. Indominco Mandiri (IM). In highwall slope, slope direction of bedding planes have opposite slopes, the avalanche potential will be influenced by the presence of geological structures in addition to the field of bedding planes and rock weathering rates. <br /> <br /> <br /> In this case, the modeling is done by using the limit equilibrium method through software SLIDE version 5.0 of Rocscience and by using the distinct element method through software UDEC (Universal Distinct Element Code) from Itasca to analyze the slope stability of the possibility of avalanche bow through the safety factor and to submit recommendations of safe slopes. From processing and data analysis which includes the distribution of displacement, stress distribution and the safety factor, it is found that there are several points of observation which are less steady. Safety factor on the slopes is the average value of 1.4611. Therefore it is necessary to change the slope geometry that will be recommended. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Instability of a slope will result in the collapse of the rock around the excavation site. For that reason a slope stability analysis is needed to anticipate the possibility of avalanches on the slopes, so that the sustainability of the mining process and the health and safety of both labor and equipment can be guaranteed. <br /> <br /> <br /> Lowwall slope stability analysis was conducted on a cross-section taken from Pit 8A, one pit mining in the East Block, PT. Indominco Mandiri (IM). In highwall slope, slope direction of bedding planes have opposite slopes, the avalanche potential will be influenced by the presence of geological structures in addition to the field of bedding planes and rock weathering rates. <br /> <br /> <br /> In this case, the modeling is done by using the limit equilibrium method through software SLIDE version 5.0 of Rocscience and by using the distinct element method through software UDEC (Universal Distinct Element Code) from Itasca to analyze the slope stability of the possibility of avalanche bow through the safety factor and to submit recommendations of safe slopes. From processing and data analysis which includes the distribution of displacement, stress distribution and the safety factor, it is found that there are several points of observation which are less steady. Safety factor on the slopes is the average value of 1.4611. Therefore it is necessary to change the slope geometry that will be recommended.
format Final Project
author INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN
spellingShingle INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN
HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
author_facet INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN
author_sort INDIRAWATI (NIM : 12106019); Pembimbing : Prof. Dr. Ir. Irwandy Arif, M.Sc., DESTIEN
title HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
title_short HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
title_full HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
title_fullStr HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
title_full_unstemmed HIGHWALL SLOPE STABILITY ANALYSIS USING DISTINCT ELEMENT METHOD AND LIMIT EQUILIBRIUM METHOD
title_sort highwall slope stability analysis using distinct element method and limit equilibrium method
url https://digilib.itb.ac.id/gdl/view/18280
_version_ 1820745836914540544