#TITLE_ALTERNATIVE#

Many rural area in Indonesia, for example in North Sulawesi there are 54 <br /> <br /> <br /> <br /> <br /> villages, still have problem about accessibility of electrical energy, thus many <br /> <br /> <br /> <br /> <br /> peop...

Full description

Saved in:
Bibliographic Details
Main Author: LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18505
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18505
spelling id-itb.:185052017-09-27T14:41:02Z#TITLE_ALTERNATIVE# LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18505 Many rural area in Indonesia, for example in North Sulawesi there are 54 <br /> <br /> <br /> <br /> <br /> villages, still have problem about accessibility of electrical energy, thus many <br /> <br /> <br /> <br /> <br /> people are unable to obtain the electricity for lighting. Solar energy can be used <br /> <br /> <br /> <br /> <br /> as alternative energy to solve this problem. Electrical energy is converted from <br /> <br /> <br /> <br /> <br /> radiation of the sun, then it is stored on a battery. In order to use energy from the <br /> <br /> <br /> <br /> <br /> battery, we have to convert DC to AC form. In present work, DC-AC converter <br /> <br /> <br /> <br /> <br /> based on multi vibrator CD 4047B was constructed with average efficiency up to <br /> <br /> <br /> <br /> <br /> 46.26%. By using 12 Volt DC battery 5 Ah, 40 watt lamp can be turned on until <br /> <br /> <br /> <br /> <br /> 25 minutes. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Many rural area in Indonesia, for example in North Sulawesi there are 54 <br /> <br /> <br /> <br /> <br /> villages, still have problem about accessibility of electrical energy, thus many <br /> <br /> <br /> <br /> <br /> people are unable to obtain the electricity for lighting. Solar energy can be used <br /> <br /> <br /> <br /> <br /> as alternative energy to solve this problem. Electrical energy is converted from <br /> <br /> <br /> <br /> <br /> radiation of the sun, then it is stored on a battery. In order to use energy from the <br /> <br /> <br /> <br /> <br /> battery, we have to convert DC to AC form. In present work, DC-AC converter <br /> <br /> <br /> <br /> <br /> based on multi vibrator CD 4047B was constructed with average efficiency up to <br /> <br /> <br /> <br /> <br /> 46.26%. By using 12 Volt DC battery 5 Ah, 40 watt lamp can be turned on until <br /> <br /> <br /> <br /> <br /> 25 minutes.
format Theses
author LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN
spellingShingle LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN
#TITLE_ALTERNATIVE#
author_facet LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN
author_sort LAURENSIUS NADEAK (NIM : 902110040)Pembimbing : Dr. Eng. Suprijadi Haryono, FIRMAN
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/18505
_version_ 1820745901462781952