BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE

Indonesia will enter the era of free trade which is characterized by the commencement of the ASEAN Economic Community (AEC) on 31 December 2015. In preparing for the era of free trade, the Government has formulated Indonesian Economic Development (MP3EI), which also mandates the development of new c...

Full description

Saved in:
Bibliographic Details
Main Author: ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18526
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18526
spelling id-itb.:185262017-09-27T14:50:40ZBUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18526 Indonesia will enter the era of free trade which is characterized by the commencement of the ASEAN Economic Community (AEC) on 31 December 2015. In preparing for the era of free trade, the Government has formulated Indonesian Economic Development (MP3EI), which also mandates the development of new centers of economic growth in the form of Special Economic Zones (KEK). To bring up the promotion of climate on SEZ, the government provides fiscal and non-fiscal facilities to investors, but the facility is still not enough. Licensing procedures to obtain facilities in the SEZ has to go through several doors, is still an obstacle for investors to invest. <br /> <br /> <br /> Analysis of existing systems by using Value Stream Mapping shows starting a business licensing process takes 27-76 days via (4) four stages of licensing. Stages that must be passed is the stage to get the status of business entities, the registration phase of the Central Government (PTSP BKPM), the stage of registration in the Local Government (Local BPPT) and the registration of employment. The existing system contains a lot of waste that has the potential to be repaired. <br /> <br /> <br /> Improvement system in this study using the Business Process Improvement in the form of One Stop Services (OSS). The design of the licensing procedure SEZ will pass through four (4) that the procedure of registration, convertion documents into electronic documents, verification and approval of documents, and the submission of documents to investors. <br /> <br /> <br /> There are (3) three alternate OSS management that will be implemented gradually. The initial phase of OSS will be managed by The Council of Regions, namely the delegation of authority granted by the Government and Local Government as Administrator SEZ, and will require 5-10 days. The next stage of OSS is managed jointly by by The Council of Regions and Business Entity as administrator SEZ will require 5-8 days. In the alternative would be carried out in their delegation of authority in the field of land from the by The Council of Regions to the Business Entity for Business Entities in fact been given the right to land at the time of registering as a Business Entity of SEZ. If Business Entity already performing well, the next stage OSS fully managed by the Business Entity as administrator SEZ, and licensing will be 5-7 days. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia will enter the era of free trade which is characterized by the commencement of the ASEAN Economic Community (AEC) on 31 December 2015. In preparing for the era of free trade, the Government has formulated Indonesian Economic Development (MP3EI), which also mandates the development of new centers of economic growth in the form of Special Economic Zones (KEK). To bring up the promotion of climate on SEZ, the government provides fiscal and non-fiscal facilities to investors, but the facility is still not enough. Licensing procedures to obtain facilities in the SEZ has to go through several doors, is still an obstacle for investors to invest. <br /> <br /> <br /> Analysis of existing systems by using Value Stream Mapping shows starting a business licensing process takes 27-76 days via (4) four stages of licensing. Stages that must be passed is the stage to get the status of business entities, the registration phase of the Central Government (PTSP BKPM), the stage of registration in the Local Government (Local BPPT) and the registration of employment. The existing system contains a lot of waste that has the potential to be repaired. <br /> <br /> <br /> Improvement system in this study using the Business Process Improvement in the form of One Stop Services (OSS). The design of the licensing procedure SEZ will pass through four (4) that the procedure of registration, convertion documents into electronic documents, verification and approval of documents, and the submission of documents to investors. <br /> <br /> <br /> There are (3) three alternate OSS management that will be implemented gradually. The initial phase of OSS will be managed by The Council of Regions, namely the delegation of authority granted by the Government and Local Government as Administrator SEZ, and will require 5-10 days. The next stage of OSS is managed jointly by by The Council of Regions and Business Entity as administrator SEZ will require 5-8 days. In the alternative would be carried out in their delegation of authority in the field of land from the by The Council of Regions to the Business Entity for Business Entities in fact been given the right to land at the time of registering as a Business Entity of SEZ. If Business Entity already performing well, the next stage OSS fully managed by the Business Entity as administrator SEZ, and licensing will be 5-7 days.
format Theses
author ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA
spellingShingle ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA
BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
author_facet ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA
author_sort ADYA SARI (NIM : 23411059); Pembimbing : Prof. Dr. Senator Nur Bahagia, FRIDA
title BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
title_short BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
title_full BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
title_fullStr BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
title_full_unstemmed BUREAUCRACY FACILITATION IN SPECIAL ECONOMIC ZONE
title_sort bureaucracy facilitation in special economic zone
url https://digilib.itb.ac.id/gdl/view/18526
_version_ 1820745907438616576