JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA

Along with the times, the need for availability of adequate transportation infrastructure is also becoming increasingly high. Road infrastructure facilities is one of the most strategic transport infrastructure. To maintain its performance, then the road infrastructure needs to be managed such that...

Full description

Saved in:
Bibliographic Details
Main Author: GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18561
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18561
spelling id-itb.:185612017-09-27T10:25:47ZJOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin, Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18561 Along with the times, the need for availability of adequate transportation infrastructure is also becoming increasingly high. Road infrastructure facilities is one of the most strategic transport infrastructure. To maintain its performance, then the road infrastructure needs to be managed such that the condition can be maintained as closely as possible with the optimum funding. <br /> <br /> <br /> One innovative form of contract to be discussed is the form of contract Design-Build-Operation-Maintain, which is often referred to as the Performance Based Contract (PBC). PBC is a type of contract that bases payment on the fulfillment of minimum performance indicators. Implementation of PBC requires a shift in work culture, be it a street organizer as service users, service providers, and society as road users. <br /> <br /> <br /> General purpose implementation of PBC is to ensure the quality of the output to fit the desired owner and reduce the costs incurred by both service users and service providers. Based on these objectives, the working of the PBC project is different from the traditional contract method has been applied to road projects in Indonesia. Some differences include a longer contract period (should be multi-years), the risk of failure is borne by the performance of service providers / service users as agreed in the sharing of risks, and pre-qualification stage which takes more time during the auction process text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Along with the times, the need for availability of adequate transportation infrastructure is also becoming increasingly high. Road infrastructure facilities is one of the most strategic transport infrastructure. To maintain its performance, then the road infrastructure needs to be managed such that the condition can be maintained as closely as possible with the optimum funding. <br /> <br /> <br /> One innovative form of contract to be discussed is the form of contract Design-Build-Operation-Maintain, which is often referred to as the Performance Based Contract (PBC). PBC is a type of contract that bases payment on the fulfillment of minimum performance indicators. Implementation of PBC requires a shift in work culture, be it a street organizer as service users, service providers, and society as road users. <br /> <br /> <br /> General purpose implementation of PBC is to ensure the quality of the output to fit the desired owner and reduce the costs incurred by both service users and service providers. Based on these objectives, the working of the PBC project is different from the traditional contract method has been applied to road projects in Indonesia. Some differences include a longer contract period (should be multi-years), the risk of failure is borne by the performance of service providers / service users as agreed in the sharing of risks, and pre-qualification stage which takes more time during the auction process
format Final Project
author GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin,
spellingShingle GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin,
JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
author_facet GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin,
author_sort GUNAWAN SUTANTO (NIM : 15005046); Pembimbing : Prof. Dr. Ir. Rizal Z. Tamin,
title JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
title_short JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
title_full JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
title_fullStr JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
title_full_unstemmed JOB AND SERVICES SPECIFICATION REVIEW IN AUCTION OF PBC DOCUMENTS ON THE NATIONAL ROAD IN INDONESIA
title_sort job and services specification review in auction of pbc documents on the national road in indonesia
url https://digilib.itb.ac.id/gdl/view/18561
_version_ 1820745918485364736