FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM

Muara Enim District well known as a districts in Indonesia that producing oil and natural gas. In the recent years, a decline in lifting gained, thus reduced revenue sharing from oil and gas sector. In the calculation of revenue sharing, there was a significant decline in 2010 that about 50% from 20...

Full description

Saved in:
Bibliographic Details
Main Author: Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18609
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18609
spelling id-itb.:186092017-09-27T15:31:13ZFEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18609 Muara Enim District well known as a districts in Indonesia that producing oil and natural gas. In the recent years, a decline in lifting gained, thus reduced revenue sharing from oil and gas sector. In the calculation of revenue sharing, there was a significant decline in 2010 that about 50% from 2009. In the other hand, the sharing of natural gas in the District of Muara Enim predicted to increase.To solve this problem, Muara Enim district plans to increase revenue by utilizing the distribution of natural gas lifting. The solution comes through several businesses project, one of the solution determined by build a construction of gas power plants using its natural resources. Before running the project, Muara Enim District has been conducted an analysis of their natural gas distribution, which is will be converted into the amount of planned generating plant capacity.The amount of generating capacity resulted from the power plant capacity. In the way of that, it can be calculate the amount of the costs incurred in order to determining price of electricity that intended to be sold to government/PLN. The electricity price is calculated based on the costs incurred by an electric generator. Finally, the final project results and conclusions will be concluding from the analysis of feasibility study in order to calculating and valuating gas power plant project. From the feasibility study analysis conducted, it can be concluded that the construction of gas power plants is feasible to run, it can be seen from a positive NPV (USD 15,175,775), the IRR exceeds the cost of capital (13.12%), more than one PI (1.23), and also the project payback is relatively fast through 6.25 years. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Muara Enim District well known as a districts in Indonesia that producing oil and natural gas. In the recent years, a decline in lifting gained, thus reduced revenue sharing from oil and gas sector. In the calculation of revenue sharing, there was a significant decline in 2010 that about 50% from 2009. In the other hand, the sharing of natural gas in the District of Muara Enim predicted to increase.To solve this problem, Muara Enim district plans to increase revenue by utilizing the distribution of natural gas lifting. The solution comes through several businesses project, one of the solution determined by build a construction of gas power plants using its natural resources. Before running the project, Muara Enim District has been conducted an analysis of their natural gas distribution, which is will be converted into the amount of planned generating plant capacity.The amount of generating capacity resulted from the power plant capacity. In the way of that, it can be calculate the amount of the costs incurred in order to determining price of electricity that intended to be sold to government/PLN. The electricity price is calculated based on the costs incurred by an electric generator. Finally, the final project results and conclusions will be concluding from the analysis of feasibility study in order to calculating and valuating gas power plant project. From the feasibility study analysis conducted, it can be concluded that the construction of gas power plants is feasible to run, it can be seen from a positive NPV (USD 15,175,775), the IRR exceeds the cost of capital (13.12%), more than one PI (1.23), and also the project payback is relatively fast through 6.25 years.
format Theses
author Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry
spellingShingle Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry
FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
author_facet Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry
author_sort Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry
title FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
title_short FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
title_full FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
title_fullStr FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
title_full_unstemmed FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
title_sort feasibility study for gas power plant project in kabupaten muara enim