BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME

This research addresses flow shop batch scheduling problem which considers machine deterioration. The processing time of parts in a batch scheduled at a position is shorter than that at the previous position in a backward scheduling approach. The objective is to minimize total actual flow time defin...

Full description

Saved in:
Bibliographic Details
Main Author: NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18771
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18771
spelling id-itb.:187712017-09-27T14:50:39Z BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18771 This research addresses flow shop batch scheduling problem which considers machine deterioration. The processing time of parts in a batch scheduled at a position is shorter than that at the previous position in a backward scheduling approach. The objective is to minimize total actual flow time defined as total interval between respective arrival times of all parts in all batches and their common due date. Decision variables are the number of batches (N), batch sizes (Q) and sequence of the resulting batches on m-machine. The solution method is solved by relaxing variable N to be a parameter, started from N = 1 and increased one by one iteratively until a stopping rule is satisfied. The chosen solution is given by the solution that gives the smallest total actual flow time between other solutions from all iterations. Numerical experiments shows that the proposed method can be used to solve the discussed problem. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This research addresses flow shop batch scheduling problem which considers machine deterioration. The processing time of parts in a batch scheduled at a position is shorter than that at the previous position in a backward scheduling approach. The objective is to minimize total actual flow time defined as total interval between respective arrival times of all parts in all batches and their common due date. Decision variables are the number of batches (N), batch sizes (Q) and sequence of the resulting batches on m-machine. The solution method is solved by relaxing variable N to be a parameter, started from N = 1 and increased one by one iteratively until a stopping rule is satisfied. The chosen solution is given by the solution that gives the smallest total actual flow time between other solutions from all iterations. Numerical experiments shows that the proposed method can be used to solve the discussed problem.
format Theses
author NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR
spellingShingle NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR
BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
author_facet NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR
author_sort NORIZKI( NIM : 23411029 ); Pemimbing : Prof. Dr. Ir. Abdul Hakim Halim, JULFIKAR
title BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
title_short BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
title_full BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
title_fullStr BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
title_full_unstemmed BATCH SCHEDULING FOR A SINGLE ITEM FLOW SHOP WHICH CONSIDERS MACHINE DETERIORATION TO MINIMIZE TOTAL ACTUAL FLOW TIME
title_sort batch scheduling for a single item flow shop which considers machine deterioration to minimize total actual flow time
url https://digilib.itb.ac.id/gdl/view/18771
_version_ 1821119633371955200