SILL PILLAR STABILITY ANALYSIS BASED ON DISCONTINUITY PLANE IN CROSSCUT 10.4 SOUTH CIURUG UNDERGROUND MINE, UBPE PONGKOR PT. ANTAM Tbk.
UBPE Pongkor PT. ANTAM, Tbk. has been mining Ciurug vein at two different levels which are level 500 and level 600 using overhand stoping cut and fill. This aim is to increase production capacity. Until now, mining in level 500 will reach sill pillar zone. This zone is ore zone at the top level 500...
Saved in:
Main Author: | PUTRA ADHI LAKSANA (NIM : 12106014); Pembimbing : Dr. Ir. Budi Sulistianto, MT., M. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18947 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
Stability evaluation of Ciurug mine tunnel based on geomechanical classification in cut and fill Pongkor gold underground mine PT. Antam., TBK West Java Indonesia
by: , PHONEKEO, Vithaya, et al.
Published: (2009) -
ANALYSIS OF THE EFFECT OF GRINDING BALL SIZE BLENDING ON THE OPTIMATION OF MILL CIRCUIT AT PT. ANTAM UBPE PONGKOR PROCESS PLANT
by: APRIYANTO (NIM : 12509034), ANDI -
MEASURENTMENT OF RESISTANCE AT AIRWAYS AND VENTILATION SYSTEM NETWORK ANALYSIS IN MINE CIURUG UBPE PONGKOR, PT. ANEKA TAMBANG Tbk. USING SIMULATOR KAZEMARU
by: AKHMAD YUNADI (NIM 12101038); Pembimbing: Dr. Nuhindro Priagung Widodo, ST.,MT., NINO