#TITLE_ALTERNATIVE#
Coal is a fossil fuel, which is necessary for the industry worldwide as a fuel, other than oil. Coal prices are projected to increase in line with rising demand and rapid growth in the industrialized countries-countries in Asia, especially India and China. With the growth of prices for coal, coal be...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19305 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:19305 |
---|---|
spelling |
id-itb.:193052017-09-27T15:30:58Z#TITLE_ALTERNATIVE# RISMY (NIM: 29109334); Pembimbing 1: Ir. Uke Marius Siahaan, MBA ; Pembimbing 2: Dr. Ir. B, RICHIE Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19305 Coal is a fossil fuel, which is necessary for the industry worldwide as a fuel, other than oil. Coal prices are projected to increase in line with rising demand and rapid growth in the industrialized countries-countries in Asia, especially India and China. With the growth of prices for coal, coal becomes very attractive to investors. This can be seen from the sale of coal mine offered PT. AC in PT. XYZ. PT. AC as an investment company that offers a coal mine in PT. XYZ which is a mining company operating in Indonesia. Mine has to offer is located in East Kalimantan, Indonesia. PT. XYZ as a prospective buyer should conduct financial analysis and risk to be faced. <br /> <br /> <br /> PT.AC offer this for USD 22 million with low-quality coal, which is 5640 calories, 28.2% ash, 3.06% sulfur, excellence PKP2B mine has had the first generation with 45% tax. PT. XYZ is able to sell low-quality coal in India. To add to adding value to the quality of coal, one way to improve the quality of coal by using a washing plan. This project without using the washing plan requires an initial production cost of USD 22,020,500 and USD 34,020,500 for washing plan. For PT. XYZ need to conduct feasibility studies, project feasibility study results offered decent thing to do with the choice of PT. XYZ does not use the washing plan that can save the cost of investment USD 9.5 million due to PT. XYZ has a market in India to sell coal to the quality of what it is, other thanPrecedent Transaction done that calculates the price of acquisition transactions of similar companies, then the result for the price of the project is USD 38,153,414 to 55,936,000 USD. The project offers good value and has conducted risk management as a consideration for PT. XYZ. For that PT is recommended. PT. XYZ bought mine with a strategy without a coal washing plan. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Coal is a fossil fuel, which is necessary for the industry worldwide as a fuel, other than oil. Coal prices are projected to increase in line with rising demand and rapid growth in the industrialized countries-countries in Asia, especially India and China. With the growth of prices for coal, coal becomes very attractive to investors. This can be seen from the sale of coal mine offered PT. AC in PT. XYZ. PT. AC as an investment company that offers a coal mine in PT. XYZ which is a mining company operating in Indonesia. Mine has to offer is located in East Kalimantan, Indonesia. PT. XYZ as a prospective buyer should conduct financial analysis and risk to be faced. <br />
<br />
<br />
PT.AC offer this for USD 22 million with low-quality coal, which is 5640 calories, 28.2% ash, 3.06% sulfur, excellence PKP2B mine has had the first generation with 45% tax. PT. XYZ is able to sell low-quality coal in India. To add to adding value to the quality of coal, one way to improve the quality of coal by using a washing plan. This project without using the washing plan requires an initial production cost of USD 22,020,500 and USD 34,020,500 for washing plan. For PT. XYZ need to conduct feasibility studies, project feasibility study results offered decent thing to do with the choice of PT. XYZ does not use the washing plan that can save the cost of investment USD 9.5 million due to PT. XYZ has a market in India to sell coal to the quality of what it is, other thanPrecedent Transaction done that calculates the price of acquisition transactions of similar companies, then the result for the price of the project is USD 38,153,414 to 55,936,000 USD. The project offers good value and has conducted risk management as a consideration for PT. XYZ. For that PT is recommended. PT. XYZ bought mine with a strategy without a coal washing plan. |
format |
Theses |
author |
RISMY (NIM: 29109334); Pembimbing 1: Ir. Uke Marius Siahaan, MBA ; Pembimbing 2: Dr. Ir. B, RICHIE |
spellingShingle |
RISMY (NIM: 29109334); Pembimbing 1: Ir. Uke Marius Siahaan, MBA ; Pembimbing 2: Dr. Ir. B, RICHIE #TITLE_ALTERNATIVE# |
author_facet |
RISMY (NIM: 29109334); Pembimbing 1: Ir. Uke Marius Siahaan, MBA ; Pembimbing 2: Dr. Ir. B, RICHIE |
author_sort |
RISMY (NIM: 29109334); Pembimbing 1: Ir. Uke Marius Siahaan, MBA ; Pembimbing 2: Dr. Ir. B, RICHIE |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/19305 |
_version_ |
1821119798899113984 |