#TITLE_ALTERNATIVE#

An integrated of production schedules with involves purchasing and scheduling policies was developed in this research. The purchasing policy is a deal of material shipment to the suppliers for a specified time interval base on frozen interval of production schedule. The scheduling policy is the repl...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 23410077) ; Pembimbing Dr. TMA. Ari Samadhi, SUNDANA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19512
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items