PRODUCTION LEAD TIME REDUCTION OF HOT ROLLED COIL AND PLATE USING LEAN MANUFACTURING SYSTEM AT PT KRAKATAU STEEL
With the growing of national steel demand is rapidly especially for Hot Rolled Coil/Plate(HRC/P) product followed by steel global competition, it will require for PT Krakatau Steel (PT KS), The biggest Integrated Steel Industry in Indonesia, to develop competitive advantage. One form of perceived co...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19608 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!