In extraction level, the quantity of rock that should produced from drawpoint was <br /> <br /> <br /> planned as production plan. Every month the production plan can be changed or <br /> <br /> <br /> not. Changing of production plan in extraction level will...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19623 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:19623 |
---|---|
spelling |
id-itb.:196232017-09-27T10:39:05Z#TITLE_ALTERNATIVE# MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19623 In extraction level, the quantity of rock that should produced from drawpoint was <br /> <br /> <br /> planned as production plan. Every month the production plan can be changed or <br /> <br /> <br /> not. Changing of production plan in extraction level will influence the production <br /> <br /> <br /> plan in loading point. Therefore the calculation of equipment in extraction level <br /> <br /> <br /> and truck level was important to do. <br /> <br /> <br /> In calculating the ammount of equipment to reach the production target, will used <br /> <br /> <br /> two methodes. There are linear programming and cycle time simulation. <br /> <br /> <br /> The calculation of equipment using linear programming and cycle time simulation <br /> <br /> <br /> gave the near result if the production plan is not change. Using the linier <br /> <br /> <br /> programming is not appropriate if there is a change in production plan, but the <br /> <br /> <br /> cycle time simulation can observe it. <br /> <br /> <br /> Based on the calculation with linear programming and cycle time simulation, the <br /> <br /> <br /> quantity of 3 unit LHD R1600 manual/teleremote, 4 unit LHD 1600 mineGEM, <br /> <br /> <br /> 13 unit LHD R1700 manual, 16 unit of truck AD55 were enough for getting the <br /> <br /> <br /> production target in June, July, and August 2010. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
In extraction level, the quantity of rock that should produced from drawpoint was <br />
<br />
<br />
planned as production plan. Every month the production plan can be changed or <br />
<br />
<br />
not. Changing of production plan in extraction level will influence the production <br />
<br />
<br />
plan in loading point. Therefore the calculation of equipment in extraction level <br />
<br />
<br />
and truck level was important to do. <br />
<br />
<br />
In calculating the ammount of equipment to reach the production target, will used <br />
<br />
<br />
two methodes. There are linear programming and cycle time simulation. <br />
<br />
<br />
The calculation of equipment using linear programming and cycle time simulation <br />
<br />
<br />
gave the near result if the production plan is not change. Using the linier <br />
<br />
<br />
programming is not appropriate if there is a change in production plan, but the <br />
<br />
<br />
cycle time simulation can observe it. <br />
<br />
<br />
Based on the calculation with linear programming and cycle time simulation, the <br />
<br />
<br />
quantity of 3 unit LHD R1600 manual/teleremote, 4 unit LHD 1600 mineGEM, <br />
<br />
<br />
13 unit LHD R1700 manual, 16 unit of truck AD55 were enough for getting the <br />
<br />
<br />
production target in June, July, and August 2010. |
format |
Final Project |
author |
MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO |
spellingShingle |
MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO #TITLE_ALTERNATIVE# |
author_facet |
MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO |
author_sort |
MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/19623 |
_version_ |
1821119898747666432 |