In extraction level, the quantity of rock that should produced from drawpoint was <br /> <br /> <br /> planned as production plan. Every month the production plan can be changed or <br /> <br /> <br /> not. Changing of production plan in extraction level will...

Full description

Saved in:
Bibliographic Details
Main Author: MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19623
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19623
spelling id-itb.:196232017-09-27T10:39:05Z#TITLE_ALTERNATIVE# MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19623 In extraction level, the quantity of rock that should produced from drawpoint was <br /> <br /> <br /> planned as production plan. Every month the production plan can be changed or <br /> <br /> <br /> not. Changing of production plan in extraction level will influence the production <br /> <br /> <br /> plan in loading point. Therefore the calculation of equipment in extraction level <br /> <br /> <br /> and truck level was important to do. <br /> <br /> <br /> In calculating the ammount of equipment to reach the production target, will used <br /> <br /> <br /> two methodes. There are linear programming and cycle time simulation. <br /> <br /> <br /> The calculation of equipment using linear programming and cycle time simulation <br /> <br /> <br /> gave the near result if the production plan is not change. Using the linier <br /> <br /> <br /> programming is not appropriate if there is a change in production plan, but the <br /> <br /> <br /> cycle time simulation can observe it. <br /> <br /> <br /> Based on the calculation with linear programming and cycle time simulation, the <br /> <br /> <br /> quantity of 3 unit LHD R1600 manual/teleremote, 4 unit LHD 1600 mineGEM, <br /> <br /> <br /> 13 unit LHD R1700 manual, 16 unit of truck AD55 were enough for getting the <br /> <br /> <br /> production target in June, July, and August 2010. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In extraction level, the quantity of rock that should produced from drawpoint was <br /> <br /> <br /> planned as production plan. Every month the production plan can be changed or <br /> <br /> <br /> not. Changing of production plan in extraction level will influence the production <br /> <br /> <br /> plan in loading point. Therefore the calculation of equipment in extraction level <br /> <br /> <br /> and truck level was important to do. <br /> <br /> <br /> In calculating the ammount of equipment to reach the production target, will used <br /> <br /> <br /> two methodes. There are linear programming and cycle time simulation. <br /> <br /> <br /> The calculation of equipment using linear programming and cycle time simulation <br /> <br /> <br /> gave the near result if the production plan is not change. Using the linier <br /> <br /> <br /> programming is not appropriate if there is a change in production plan, but the <br /> <br /> <br /> cycle time simulation can observe it. <br /> <br /> <br /> Based on the calculation with linear programming and cycle time simulation, the <br /> <br /> <br /> quantity of 3 unit LHD R1600 manual/teleremote, 4 unit LHD 1600 mineGEM, <br /> <br /> <br /> 13 unit LHD R1700 manual, 16 unit of truck AD55 were enough for getting the <br /> <br /> <br /> production target in June, July, and August 2010.
format Final Project
author MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO
spellingShingle MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO
#TITLE_ALTERNATIVE#
author_facet MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO
author_sort MAROJAHAN NAIBAHO (NIM : 12106035); Pembimbing : Dr. Ir. Budi Sulistianto, M.T., VILFREDO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/19623
_version_ 1821119898747666432