#TITLE_ALTERNATIVE#
This study developed a model procurement plan and production plan in the <br /> <br /> <br /> <br /> <br /> refined sugar industry with a case study in PT. XYZ. The mathematical model was <br /> <br /> <br /> <br /> <br /> devel...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19757 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | This study developed a model procurement plan and production plan in the <br />
<br />
<br />
<br />
<br />
refined sugar industry with a case study in PT. XYZ. The mathematical model was <br />
<br />
<br />
<br />
<br />
developed using the assumption that demand is only fulfilled from warehouse, raw <br />
<br />
<br />
<br />
<br />
materials are always available at the supplier and the production is done <br />
<br />
<br />
<br />
<br />
continuously without any damage to the engine. Decision variable for from the <br />
<br />
<br />
<br />
<br />
model is ordering lot size’s, ordering decision, the amount of raw material that is <br />
<br />
<br />
<br />
<br />
sent, inventory of raw materials, the total production, inventory of production. <br />
<br />
<br />
<br />
<br />
Optimal decision variable is obtained by minimizing total costs. Optimal solution <br />
<br />
<br />
<br />
<br />
search conducted simultaneously and gradually. <br />
<br />
<br />
<br />
<br />
Testing and analysis carried out to demonstrate the performance of the model <br />
<br />
<br />
<br />
<br />
developed models and then compared with the real conditions in the company. <br />
<br />
<br />
<br />
<br />
Based on model analysis concluded that the procurement raw materials plan and <br />
<br />
<br />
<br />
<br />
production plans model produces the lowest total cost compared with the real <br />
<br />
<br />
<br />
<br />
conditions in the company. <br />
<br />
<br />
<br />
<br />
Sensitivity analysis is conducted to see how changing the model parameters to <br />
<br />
<br />
<br />
<br />
total cost, and optimal solution. From the sensitivity analysis found that changes <br />
<br />
<br />
<br />
<br />
in demand, transportation costs, storage costs of raw material and product <br />
<br />
<br />
<br />
<br />
influence the decision variable values and the total cost significantly. |
---|