#TITLE_ALTERNATIVE#

The Aerostructure division of PT. Dirgantara Indonesia (PT. DI) is a Make-to-Order manufacturing company. To obtain long term contract, PT. DI must able to convince <br /> <br /> <br /> <br /> <br /> <br /> <br /> that consumers’ request for h...

Full description

Saved in:
Bibliographic Details
Main Author: NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19951
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19951
spelling id-itb.:199512017-09-27T11:39:11Z#TITLE_ALTERNATIVE# NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19951 The Aerostructure division of PT. Dirgantara Indonesia (PT. DI) is a Make-to-Order manufacturing company. To obtain long term contract, PT. DI must able to convince <br /> <br /> <br /> <br /> <br /> <br /> <br /> that consumers’ request for high quality product and on time delivery can be fulfilled. One of the problem that arises is the layout of the company. PT. DI layout design is based on process layout. As a result, the distance between machine is too far. Oftenly, re-layout is conducted to meet consumers’ contract. One of the alternatif solution that can be considered is fractal layout. Fractal layout offers an efficient material handling cost by keeping the movement of material inside <br /> <br /> <br /> <br /> <br /> <br /> <br /> cell, and also gives flexibility to withstand product variation and product mix. In layout design process, it has been indicated that there are parts which have same <br /> <br /> <br /> <br /> <br /> <br /> <br /> process. From this indication, it is figured that there are clustering of part (part family). This information will be used in designing layout which is suitable to be <br /> <br /> <br /> <br /> <br /> <br /> <br /> implemented in PT. DI. The layout design process is done by distributing machines owned by PT DI into fractal cell, where each cell has a similar machines composition. Then flow assignment is given to each cell. At the final step, the layout of machines inside cell <br /> <br /> <br /> <br /> <br /> <br /> <br /> and the layout of cell inside shop floor are optimized using part routing from flow assignment. The result of the design are fractal layout (fractal A) and fractal layout which focused on certain part group (fractal B). Fractal A gives a better material handling cost and <br /> <br /> <br /> <br /> <br /> <br /> <br /> flexibility compared to fractal B. While fractal B gives another alternatif solution if there were part family with high variation product. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Aerostructure division of PT. Dirgantara Indonesia (PT. DI) is a Make-to-Order manufacturing company. To obtain long term contract, PT. DI must able to convince <br /> <br /> <br /> <br /> <br /> <br /> <br /> that consumers’ request for high quality product and on time delivery can be fulfilled. One of the problem that arises is the layout of the company. PT. DI layout design is based on process layout. As a result, the distance between machine is too far. Oftenly, re-layout is conducted to meet consumers’ contract. One of the alternatif solution that can be considered is fractal layout. Fractal layout offers an efficient material handling cost by keeping the movement of material inside <br /> <br /> <br /> <br /> <br /> <br /> <br /> cell, and also gives flexibility to withstand product variation and product mix. In layout design process, it has been indicated that there are parts which have same <br /> <br /> <br /> <br /> <br /> <br /> <br /> process. From this indication, it is figured that there are clustering of part (part family). This information will be used in designing layout which is suitable to be <br /> <br /> <br /> <br /> <br /> <br /> <br /> implemented in PT. DI. The layout design process is done by distributing machines owned by PT DI into fractal cell, where each cell has a similar machines composition. Then flow assignment is given to each cell. At the final step, the layout of machines inside cell <br /> <br /> <br /> <br /> <br /> <br /> <br /> and the layout of cell inside shop floor are optimized using part routing from flow assignment. The result of the design are fractal layout (fractal A) and fractal layout which focused on certain part group (fractal B). Fractal A gives a better material handling cost and <br /> <br /> <br /> <br /> <br /> <br /> <br /> flexibility compared to fractal B. While fractal B gives another alternatif solution if there were part family with high variation product.
format Final Project
author NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU
spellingShingle NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU
#TITLE_ALTERNATIVE#
author_facet NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU
author_sort NURBAYA (NIM: 13403049) Pembimbing : (Dr. Ir. Anas Ma’ruf), BAYU
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/19951
_version_ 1821119999100583936