Pigging Time Optimization Using Flow Efficiency Method and Flow Index Ratio in Wet Gas Pipeline (Case Study : Wet Gas Pipeline in Field
The problem that often occurred in gas pipeline is the presence of condensation process. Condensation is a process of liquid forming caused by the difference of operating pressure and temperature in gas pipeline. Condensation can influence operating gas industry activities especially in gas pipeline...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20120 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!