#TITLE_ALTERNATIVE#
PT. XYZ is conducting a coal mining in Pit Ata of Batulicin Mine in South Kalimantan. Current highwall height is 80 m and PT. XYZ has a plan to mine the coal until reaching a highwall of 120 m high.<P> <br /> <br /> <br /> This research consisted of site investigation, labor...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20391 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |