#TITLE_ALTERNATIVE#
Underground mine refilling process (backfilling) is one of important factors in cut and fill mining system that is applied at PT Antam Tbk UBPE Pongkor. Before the tailing slurry is filled into stope, it is precipitated in a thickener unit to improve percent solid of underflow (become 55-60% solid)...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!