SCAFFOLDING PLANNING OF PARKING BUILDING LIFESTYLE CENTER SUMMARECON BANDUNG

A civil building construction starts with the most important stages which is structure stages because it determines the building to withstand durability in both live load and dead load bearing. The reinforced-concrete building has a high risk level on destruction if the planning stages do not work w...

Full description

Saved in:
Bibliographic Details
Main Author: AULIADI AKBAR, ADE
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20710
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:A civil building construction starts with the most important stages which is structure stages because it determines the building to withstand durability in both live load and dead load bearing. The reinforced-concrete building has a high risk level on destruction if the planning stages do not work well. Therefore, the structure planning must be designed correctly to fulfill the criteria design such as strength, serviceability, safety, and durability. To withstand the fresh concrete while casting and forming the structure element, a formwork is needed. One of the main item of formwork is scaffolding which is used for temporary structure to support the formwork before reinforcement and casting. A well-designed scaffolding supposed to support load bearing and maintain the structure form without exceeding the allowable deflection. Lifestyle Center Summarecon Bandung Project use a frame scaffolding which consists of Main Frame 1219, Ladder Frame 90, Jack Base 40, and Cross Brace. The space between scaffoldings is designed around 1.6 m to 2 m. By attaining the space, scaffolding is capable to bear the current loads and maintain the structure form without exceeding the allowable deflection.