#TITLE_ALTERNATIVE#

Bandung Metropolitan Project is a water supply project cerated by the Dinas Pekerjaan Umum Jawa Barat for Bandung City and Bandung Regency. The background of this project is limited water source in Bandung City, while Bandung Regency has a lot of water sources. In phase I, for the district of Bandun...

Full description

Saved in:
Bibliographic Details
Main Author: FERINA RAMADHIANI ( NIM 15311061 ) , ANNISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21142
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Bandung Metropolitan Project is a water supply project cerated by the Dinas Pekerjaan Umum Jawa Barat for Bandung City and Bandung Regency. The background of this project is limited water source in Bandung City, while Bandung Regency has a lot of water sources. In phase I, for the district of Bandung, Bandung Metropolitan Project will serves several areas in Margahayu District and Margaasih District which have never been served by PDAM before. For this project, the water source is from Cisangkuy River which is located in Cikalong. To complete this project, a reservoir and a 200 l/s capacity water treatment plant are built at Sukamaju Village. Water from reservoir flows to the service areas in Margaasih and Margahayu District by gravity system. Development of the water distribution network system is planned to take place during the next 20 years with the maximum amount of water is 200 l/s. In this study, conducted three alternative designs of water distribution pipelines. The water distribution network system is designed to fulfill the need of water at Q peak hour, which is 196.44 l/s. A good water distribution network system can be determined by using EPANET 2.0. This plan is expected to be an alternative water supply for Bandung Metropolitan Project in terms of quantity and continuity.