FOREBAY, PENSTOCK, POWER HOUSE, AND TAILRACE PLANNING IN CIROMPANG MINIHYDRO POWER PLANT, CIHIKEU, DISTRICT BUNGBULANG, GARUT REGENCY, WEST JAVA

The needs of energy is increasing along with the development of human needs. One of energy which considered as society’s main needs is electricity. In Indonesia, there are a lot of villages which hasn’t had electricity, especially in the remote area. It happens because of the difficult access...

Full description

Saved in:
Bibliographic Details
Main Author: ZAKIYAH (NIM : 15813028), ANNISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21153
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia