COST ANALYSIS OF SLURRY INJECTION PROJECT FOR HYDROCARBON IMPACTED SOIL FOR PRODUCTION SHARING CONTRACT IN CENTRAL SUMATERA AREA
Approaching expiration period of Production Sharing Contract (PSC) with Government of Indonesia, <br /> <br /> company has obligation to complete the remediation program of Hydrocarbon Impacted Soil (HIS) <br /> <br /> which produced during company’s eksploration and prod...
Saved in:
Main Author: | PADUA ANGGER RADITE 29115235 , ANTONIUS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21164 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Effect of non-ionic surfactants on elimination of polycyclic aromatic hydrocarbons (PAHs) in soil-slurry by Phanerochaete chrysosporium
by: Zheng, Z., et al.
Published: (2014) -
HYDROCARBON MIGRATION PATHWAYS ASSESSMENT IN UNGARAN AREA, CENTRAL JAVA, INDONESIA
by: , MAO CHANRITHYROUTH, et al.
Published: (2011) -
Sedimentation behavior of flocculant-treated soil slurry
by: He, Jia, et al.
Published: (2017) -
Land reclamation & soil improvement using dredged slurry as fill
by: Lam, Kok Pang
Published: (2018) -
Bioremediation of petroleum hydrocarbons in soil microcosms
by: Ting, Y.P., et al.
Published: (2012)