#TITLE_ALTERNATIVE#

The service area for Gambung Project includes 11 villages that located in Bandung Regency and have not served with water supply from PDAM Tirta Raharja. The village are Sadu, Pamekaran , Cingcin, Sekarwangi, Parungserab, Katapang, Cilampeni, and Pangauban. Based on data from PDAM Tirta Raharja, the...

Full description

Saved in:
Bibliographic Details
Main Author: YANTI (NIM : 15311073), ANUGRAH
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21174
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:21174
spelling id-itb.:211742017-11-17T14:43:36Z#TITLE_ALTERNATIVE# YANTI (NIM : 15311073), ANUGRAH Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21174 The service area for Gambung Project includes 11 villages that located in Bandung Regency and have not served with water supply from PDAM Tirta Raharja. The village are Sadu, Pamekaran , Cingcin, Sekarwangi, Parungserab, Katapang, Cilampeni, and Pangauban. Based on data from PDAM Tirta Raharja, the service of water supply in Bandung regency is 12 %, while the service based on the goal of Millenium Develompent Goal’s (MGD) have to reach 67 %. Therefore, PDAM Tirta Raharja plan to implement some alternative project to expand and develop the service coverage. One of them is Gambung Project. The goal of this project is to design a water distribution system to cover the needs of water supply for the inhabitants in the area of service with the distributed water debit is 398.06 liter/second.. Source of raw water is some spring that exist Alternatif, distribusi, EPANET, proyeksi, reservoir in the Cisandori River, Mekarsari, Kecamatan Pasirjambu. Reservoir is located in Sadu Village at +770 m. Period of planning to develop system for design a water distribution network is about 20 years and percent of service in stage I is 45 % and stage II is 49 %. Through some method and data processing, it can be determine water supply distribution network system in service area that fulfill the technical requirements so it can be safely implemented on this project. Planning water distribution pathway use EPANET 2.0. There are 3 alternative for this project. Three of alternative will be compare using some parameter and after that determine the best alternative. This alternative distribution system expected to fulfill the needs of water supply in the area of service that have a good quality, quantity, and have good continuity. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The service area for Gambung Project includes 11 villages that located in Bandung Regency and have not served with water supply from PDAM Tirta Raharja. The village are Sadu, Pamekaran , Cingcin, Sekarwangi, Parungserab, Katapang, Cilampeni, and Pangauban. Based on data from PDAM Tirta Raharja, the service of water supply in Bandung regency is 12 %, while the service based on the goal of Millenium Develompent Goal’s (MGD) have to reach 67 %. Therefore, PDAM Tirta Raharja plan to implement some alternative project to expand and develop the service coverage. One of them is Gambung Project. The goal of this project is to design a water distribution system to cover the needs of water supply for the inhabitants in the area of service with the distributed water debit is 398.06 liter/second.. Source of raw water is some spring that exist Alternatif, distribusi, EPANET, proyeksi, reservoir in the Cisandori River, Mekarsari, Kecamatan Pasirjambu. Reservoir is located in Sadu Village at +770 m. Period of planning to develop system for design a water distribution network is about 20 years and percent of service in stage I is 45 % and stage II is 49 %. Through some method and data processing, it can be determine water supply distribution network system in service area that fulfill the technical requirements so it can be safely implemented on this project. Planning water distribution pathway use EPANET 2.0. There are 3 alternative for this project. Three of alternative will be compare using some parameter and after that determine the best alternative. This alternative distribution system expected to fulfill the needs of water supply in the area of service that have a good quality, quantity, and have good continuity.
format Final Project
author YANTI (NIM : 15311073), ANUGRAH
spellingShingle YANTI (NIM : 15311073), ANUGRAH
#TITLE_ALTERNATIVE#
author_facet YANTI (NIM : 15311073), ANUGRAH
author_sort YANTI (NIM : 15311073), ANUGRAH
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/21174
_version_ 1821120382748327936