#TITLE_ALTERNATIVE#
X South field, producing gas from retrograde gas reservoir, has less than 15 years remaining contract to be completed with rate constraints. Three years from now, plateau rate has to be reached at 61 MMSCFD for whole field and after that rate over 15 MMSCFD as an economic limit has to be reached. Ma...
Saved in:
Main Author: | ARDHITO WIRAWAN SARWONO (NIM : 12206015) |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21194 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: WIRAWAN SARWONO (NIM 12206015); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ARDHITO -
#TITLE_ALTERNATIVE#
by: Sarwono (NIM 25094011), Djoko -
#TITLE_ALTERNATIVE#
by: SARWONO (NIM 28198021), JOKO -
#TITLE_ALTERNATIVE#
by: SARWONO (NIM: 13205028), TENDY -
#TITLE_ALTERNATIVE#
by: Sarwono, Djoko