Oil Reservoir that has been exploitated for a long time, well productivity decreases naturally, it caused by the decreasing reservoir pressure or increasing water production. In order to keep the oil production remain above the minimum level, the artificial lift method will be used. With this issue...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21232 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:21232 |
---|---|
spelling |
id-itb.:212322017-09-27T10:37:32Z#TITLE_ALTERNATIVE# RAHMAN HAKIM (NIM : 12207057), ARIF Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21232 Oil Reservoir that has been exploitated for a long time, well productivity decreases naturally, it caused by the decreasing reservoir pressure or increasing water production. In order to keep the oil production remain above the minimum level, the artificial lift method will be used. With this issue in mind, a production engineer is demanded having new innovative design in the application of artificial lift method that can be applied in wells in order to increase current production rate. <br /> <br /> <br /> <br /> <br /> <br /> In this final project, the oil field has two reservoir layers with different characteristics. This difference could be seen clearly from the value of Productivity Index of each layer. This conclusion is obtained after a production logging test is conducted, where the result shows that the upper layer is not contributing in the final production when the two layers are produced simultaneously (commingle). The effort that must be made is to generate maximum total production from each layer, and produce the liquid from each layer of reservoir separately. <br /> <br /> <br /> <br /> <br /> <br /> In this final project, two different artificial lift methods are proposed, therefore a comparison between these two methods could be obtained to determine which method is better used in this field of study, compared to the existing artificial method. The proposed methods are the Dual Jet Pump that applies in separate dual string, and Dual ESP that uses additional equipment is called Y-block, as a separator between upper ESP and lower ESP. <br /> <br /> <br /> <br /> <br /> <br /> To decide which method is the most suitable to be applied in this well, an economic analysis is conducted for the next 10 years. The method that gives the highest NPV value by the end of the 10th year is proposed as the first priority. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Oil Reservoir that has been exploitated for a long time, well productivity decreases naturally, it caused by the decreasing reservoir pressure or increasing water production. In order to keep the oil production remain above the minimum level, the artificial lift method will be used. With this issue in mind, a production engineer is demanded having new innovative design in the application of artificial lift method that can be applied in wells in order to increase current production rate. <br />
<br />
<br />
<br />
<br />
<br />
In this final project, the oil field has two reservoir layers with different characteristics. This difference could be seen clearly from the value of Productivity Index of each layer. This conclusion is obtained after a production logging test is conducted, where the result shows that the upper layer is not contributing in the final production when the two layers are produced simultaneously (commingle). The effort that must be made is to generate maximum total production from each layer, and produce the liquid from each layer of reservoir separately. <br />
<br />
<br />
<br />
<br />
<br />
In this final project, two different artificial lift methods are proposed, therefore a comparison between these two methods could be obtained to determine which method is better used in this field of study, compared to the existing artificial method. The proposed methods are the Dual Jet Pump that applies in separate dual string, and Dual ESP that uses additional equipment is called Y-block, as a separator between upper ESP and lower ESP. <br />
<br />
<br />
<br />
<br />
<br />
To decide which method is the most suitable to be applied in this well, an economic analysis is conducted for the next 10 years. The method that gives the highest NPV value by the end of the 10th year is proposed as the first priority. |
format |
Final Project |
author |
RAHMAN HAKIM (NIM : 12207057), ARIF |
spellingShingle |
RAHMAN HAKIM (NIM : 12207057), ARIF #TITLE_ALTERNATIVE# |
author_facet |
RAHMAN HAKIM (NIM : 12207057), ARIF |
author_sort |
RAHMAN HAKIM (NIM : 12207057), ARIF |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/21232 |
_version_ |
1821120400194535424 |