#TITLE_ALTERNATIVE#

Since the very beginning of its operations in 1983, re-injection process has been executed at the vapor dominated Kamojang geothermal field which was the first geothermal field in Indonesia, to maintain its reservoir pressure. Tracer test has been conducted for the second time in 1992 on KMJ-15 re-i...

Full description

Saved in:
Bibliographic Details
Main Author: MARSTIGA YUNIAR (NIM 122 02 008), DHANIE
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21697
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first