#TITLE_ALTERNATIVE#

Distribution of goods and services along the island of Java still mainly depends on the North Java Coastal Road Pantura. Traffic demands along this road are increasing every year and road capacity can not match this growth. The Government of Indonesia has plans to develop another Trans Java route to...

Full description

Saved in:
Bibliographic Details
Main Author: MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21905
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:21905
spelling id-itb.:219052017-11-21T11:20:36Z#TITLE_ALTERNATIVE# MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21905 Distribution of goods and services along the island of Java still mainly depends on the North Java Coastal Road Pantura. Traffic demands along this road are increasing every year and road capacity can not match this growth. The Government of Indonesia has plans to develop another Trans Java route to meet the demands and to develop the southern corridor of Java. The province of Jogyakarta will experience an impact and needs to provide input to the proposed route, as the road can support development of existing regional potencies.<p>The objective of the study is to analyze the economic feasibility of the southern route within the province of D.I. Jogyakarta, based on estimated producer surplus of agricultural commodities within the influence area. Earlier studies have produced four alternative road routes and these were evaluated. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Distribution of goods and services along the island of Java still mainly depends on the North Java Coastal Road Pantura. Traffic demands along this road are increasing every year and road capacity can not match this growth. The Government of Indonesia has plans to develop another Trans Java route to meet the demands and to develop the southern corridor of Java. The province of Jogyakarta will experience an impact and needs to provide input to the proposed route, as the road can support development of existing regional potencies.<p>The objective of the study is to analyze the economic feasibility of the southern route within the province of D.I. Jogyakarta, based on estimated producer surplus of agricultural commodities within the influence area. Earlier studies have produced four alternative road routes and these were evaluated. <br />
format Theses
author MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO
spellingShingle MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO
#TITLE_ALTERNATIVE#
author_facet MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO
author_sort MULIAWAN SATRIO (NIM 25004004); Pembimbing: Ade Sjafruddin, Ir, M.Sc., Ph.D, dan Willy Tumewu, I, EKO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/21905
_version_ 1821120606478794752