Design, Modelling, and Simulation of Water Turbine Francis Type on Case Study of Pareang Micro Hydropower with Head 83,71 m and Flow Rate 1,51m 3/s

Nowadays, electrical energy has become a primary need that cannot be separated from human life. The development of industry and technology makes the needs of electricity increase day by day. Obviously, this should be handled by provision of sufficient electricity by operating more power plants. The...

Full description

Saved in:
Bibliographic Details
Main Author: HARASTA FADRUZIL (NIM : 13112018), FARHAN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22079
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items