This final project contains reinforcement method of artificial slope that is constructed in Tana-toraja brand new airport. The slope will be the airport’s runway. Slope to be built have a high height , which is 24 meter. Other consideration for the embankment analysis is that the soil in the cons...

Full description

Saved in:
Bibliographic Details
Main Author: Y HUTAHAEAN (NIM : 15011035), FEDIK
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22132
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22132
spelling id-itb.:221322017-09-27T10:25:51Z#TITLE_ALTERNATIVE# Y HUTAHAEAN (NIM : 15011035), FEDIK Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22132 This final project contains reinforcement method of artificial slope that is constructed in Tana-toraja brand new airport. The slope will be the airport’s runway. Slope to be built have a high height , which is 24 meter. Other consideration for the embankment analysis is that the soil in the construction location contain clayshale soil which decreases its own shear strength easily. Finite element method in PLAXIS and limit equilibrium method in Slope/W will be used to <br /> <br /> <br /> analyze the stability. Meanwhile, for reinforcement method is using soil-nailing reinforcement. Failure stability to be considered are internal stability, eksternal stability and facing stability.Slope with high height is constructed in several stages construction to avoid failure. There are three steps of stage construction as if it is not done in several stages construction, then the slope will gradually collapse as subgrade decreased shear strength because it contains <br /> <br /> <br /> clayshale. The result of stability analysis is soil-nailing reinforcement along 24 meters with three stages construction. This soil-nailing design has resulted safety factor exceeded the design criteria of safety factor that have been set at first. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This final project contains reinforcement method of artificial slope that is constructed in Tana-toraja brand new airport. The slope will be the airport’s runway. Slope to be built have a high height , which is 24 meter. Other consideration for the embankment analysis is that the soil in the construction location contain clayshale soil which decreases its own shear strength easily. Finite element method in PLAXIS and limit equilibrium method in Slope/W will be used to <br /> <br /> <br /> analyze the stability. Meanwhile, for reinforcement method is using soil-nailing reinforcement. Failure stability to be considered are internal stability, eksternal stability and facing stability.Slope with high height is constructed in several stages construction to avoid failure. There are three steps of stage construction as if it is not done in several stages construction, then the slope will gradually collapse as subgrade decreased shear strength because it contains <br /> <br /> <br /> clayshale. The result of stability analysis is soil-nailing reinforcement along 24 meters with three stages construction. This soil-nailing design has resulted safety factor exceeded the design criteria of safety factor that have been set at first.
format Final Project
author Y HUTAHAEAN (NIM : 15011035), FEDIK
spellingShingle Y HUTAHAEAN (NIM : 15011035), FEDIK
#TITLE_ALTERNATIVE#
author_facet Y HUTAHAEAN (NIM : 15011035), FEDIK
author_sort Y HUTAHAEAN (NIM : 15011035), FEDIK
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/22132
_version_ 1822019707743502336