STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY

Field conditions, valid information, and good initial planning become very important in the success of flow assurance management activities, particularly in <br /> <br /> <br /> deepwater operation. Low deep water temperature environment and limitations on installation as well as...

Full description

Saved in:
Bibliographic Details
Main Author: (NIM : 22208009), FITRIYADI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22193
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22193
spelling id-itb.:221932017-09-27T15:07:46ZSTABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY (NIM : 22208009), FITRIYADI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22193 Field conditions, valid information, and good initial planning become very important in the success of flow assurance management activities, particularly in <br /> <br /> <br /> deepwater operation. Low deep water temperature environment and limitations on installation as well as maintenance of production facilities at sea, make problems that occurred in deepwater is more complicated compared to operation in onshore. So that the mistake in early planning design of facilities which used in <br /> <br /> <br /> deepwater operation, will lead to less optimal production or might be able to jeopardize the sustainability of field production. This study creates a new model of an operating prediction curves (stable operating envelope), which provides description of the safe conditions of various problems that may occur during the hydrocarbon production in deepwater operation using flow assurance. The production problems case focuses on gas hydrate formation, wax deposition, severe slugging, maximum pipe strength and back pressure occur <br /> <br /> <br /> in the system. The developed curves provide information about safe region at various liquid rates and gas liquid ratio which may occur during operation. These curves can be applied for a new production system design. The curves are enhanced by considering the influence of various water cuts of reservoir fluid. To show the <br /> <br /> <br /> implementation of developed curves, the several case study are discussed due planning of engineered efforts to the production system. All the plans studied by <br /> <br /> <br /> one purpose, so that stable operating envelope which generated can be more optimal. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Field conditions, valid information, and good initial planning become very important in the success of flow assurance management activities, particularly in <br /> <br /> <br /> deepwater operation. Low deep water temperature environment and limitations on installation as well as maintenance of production facilities at sea, make problems that occurred in deepwater is more complicated compared to operation in onshore. So that the mistake in early planning design of facilities which used in <br /> <br /> <br /> deepwater operation, will lead to less optimal production or might be able to jeopardize the sustainability of field production. This study creates a new model of an operating prediction curves (stable operating envelope), which provides description of the safe conditions of various problems that may occur during the hydrocarbon production in deepwater operation using flow assurance. The production problems case focuses on gas hydrate formation, wax deposition, severe slugging, maximum pipe strength and back pressure occur <br /> <br /> <br /> in the system. The developed curves provide information about safe region at various liquid rates and gas liquid ratio which may occur during operation. These curves can be applied for a new production system design. The curves are enhanced by considering the influence of various water cuts of reservoir fluid. To show the <br /> <br /> <br /> implementation of developed curves, the several case study are discussed due planning of engineered efforts to the production system. All the plans studied by <br /> <br /> <br /> one purpose, so that stable operating envelope which generated can be more optimal.
format Theses
author (NIM : 22208009), FITRIYADI
spellingShingle (NIM : 22208009), FITRIYADI
STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
author_facet (NIM : 22208009), FITRIYADI
author_sort (NIM : 22208009), FITRIYADI
title STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
title_short STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
title_full STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
title_fullStr STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
title_full_unstemmed STABLE OPERATING ENVELOPE ON DEEPWATER OIL FELD PRODUCTION: FLOW ASSURANCE STUDY
title_sort stable operating envelope on deepwater oil feld production: flow assurance study
url https://digilib.itb.ac.id/gdl/view/22193
_version_ 1821120695781818368