CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB

The construction of the Center for Infrastructure and Built Environment (CIBE) ITB building is one of the infrastructure development program conducted by the Bandung Institute of Technology in order to realize the vision of becoming a world class university. This building would need a good system of...

Full description

Saved in:
Bibliographic Details
Main Author: SEKAR PERTIWI (NIM : 15010089), GRESNA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22308
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22308
spelling id-itb.:223082017-09-27T10:25:49ZCONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB SEKAR PERTIWI (NIM : 15010089), GRESNA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22308 The construction of the Center for Infrastructure and Built Environment (CIBE) ITB building is one of the infrastructure development program conducted by the Bandung Institute of Technology in order to realize the vision of becoming a world class university. This building would need a good system of construction management. One important aspect of the construction management is construction planning for the structural works. <br /> <br /> <br /> In the construction project of CIBE ITB building, the structural works is divided into two main works, concrete work and steel work. Concrete work consist of plates works, columns, retaining wall, lift wall, strong wall and floor and also stairs. In concrete work, beams and slab casting process have to be done simultaneously and divided into 4 (four) zones on each floor of the building. Casting process of the works have to be done using concrete pump. Meanwhile, for the other structural works can be assisted with concrete bucket tool. Prestressed concrete work on the structure of the strong wall and floor, done with post-tension prestressing method, in which the structure will be given reinforcement on structural elements after the casting process had done. Steel work consists of laboratory steel roof and canopy. The steel Works begin on the steel fabrication of steel structural elements in the workshop, transport processes, as well as the erection and installation at the project site. <br /> <br /> <br /> In this construction method planning of structural Works in CIBE ITB building, in this paper determined the sequence of work, measures and provisions/regulations in carrying out the work coupled with consideration of K3. In addition, this paper also analyzed the material requirements, labor and tools based on Standar Nasional Indonesia Pekerjaan Beton dan Pekerjaan Baja year 2008. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The construction of the Center for Infrastructure and Built Environment (CIBE) ITB building is one of the infrastructure development program conducted by the Bandung Institute of Technology in order to realize the vision of becoming a world class university. This building would need a good system of construction management. One important aspect of the construction management is construction planning for the structural works. <br /> <br /> <br /> In the construction project of CIBE ITB building, the structural works is divided into two main works, concrete work and steel work. Concrete work consist of plates works, columns, retaining wall, lift wall, strong wall and floor and also stairs. In concrete work, beams and slab casting process have to be done simultaneously and divided into 4 (four) zones on each floor of the building. Casting process of the works have to be done using concrete pump. Meanwhile, for the other structural works can be assisted with concrete bucket tool. Prestressed concrete work on the structure of the strong wall and floor, done with post-tension prestressing method, in which the structure will be given reinforcement on structural elements after the casting process had done. Steel work consists of laboratory steel roof and canopy. The steel Works begin on the steel fabrication of steel structural elements in the workshop, transport processes, as well as the erection and installation at the project site. <br /> <br /> <br /> In this construction method planning of structural Works in CIBE ITB building, in this paper determined the sequence of work, measures and provisions/regulations in carrying out the work coupled with consideration of K3. In addition, this paper also analyzed the material requirements, labor and tools based on Standar Nasional Indonesia Pekerjaan Beton dan Pekerjaan Baja year 2008.
format Final Project
author SEKAR PERTIWI (NIM : 15010089), GRESNA
spellingShingle SEKAR PERTIWI (NIM : 15010089), GRESNA
CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
author_facet SEKAR PERTIWI (NIM : 15010089), GRESNA
author_sort SEKAR PERTIWI (NIM : 15010089), GRESNA
title CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
title_short CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
title_full CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
title_fullStr CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
title_full_unstemmed CONSTRUCTION METHOD PLANNING OF STRUCTURAL WORKS OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT ITB BUILDING WITH MODIFICATION ON THE SLAB
title_sort construction method planning of structural works of center for infrastructure and built environment itb building with modification on the slab
url https://digilib.itb.ac.id/gdl/view/22308
_version_ 1821120730993000448