Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)

A combined cycle power plant (CCPP) plays an important role in supplying electrical energy in Indonesia. It is important to do an energy audit to this industry. This audit's purposes are as an effort to find a way to conserve the energy and as an inspection to the industry for PROPER’s (Prog...

Full description

Saved in:
Bibliographic Details
Main Author: RURIANDI (NIM : 13111072), HENDRASTANTYO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22415
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22415
spelling id-itb.:224152017-10-02T09:16:12ZAssessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok) RURIANDI (NIM : 13111072), HENDRASTANTYO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22415 A combined cycle power plant (CCPP) plays an important role in supplying electrical energy in Indonesia. It is important to do an energy audit to this industry. This audit's purposes are as an effort to find a way to conserve the energy and as an inspection to the industry for PROPER’s (Program Penilaian Peringkat Kinerja Perusahaan) purpose. This study is focused on Third Plant CCPP in Tanjung Priok with 743 MW capacity. <br /> <br /> The energy assessment targets the CCPP with its all possible working load, low, middle and high working load. Methods used are data gathering from the control room, calculating parameters using thermodynamics principles, and data analysis. <br /> <br /> The data shows that the two plants are mainly operated in high working load. The analysis results shows that CCPP efficiency will rise up to above 50% if it works on middle and high working load, and efficiency will be around 44% if it works on low working load. Based on this study, suggestion has given to use 1-1-1 formation if using CCPP for low working load so that the efficiency will be risen. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description A combined cycle power plant (CCPP) plays an important role in supplying electrical energy in Indonesia. It is important to do an energy audit to this industry. This audit's purposes are as an effort to find a way to conserve the energy and as an inspection to the industry for PROPER’s (Program Penilaian Peringkat Kinerja Perusahaan) purpose. This study is focused on Third Plant CCPP in Tanjung Priok with 743 MW capacity. <br /> <br /> The energy assessment targets the CCPP with its all possible working load, low, middle and high working load. Methods used are data gathering from the control room, calculating parameters using thermodynamics principles, and data analysis. <br /> <br /> The data shows that the two plants are mainly operated in high working load. The analysis results shows that CCPP efficiency will rise up to above 50% if it works on middle and high working load, and efficiency will be around 44% if it works on low working load. Based on this study, suggestion has given to use 1-1-1 formation if using CCPP for low working load so that the efficiency will be risen. <br />
format Final Project
author RURIANDI (NIM : 13111072), HENDRASTANTYO
spellingShingle RURIANDI (NIM : 13111072), HENDRASTANTYO
Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
author_facet RURIANDI (NIM : 13111072), HENDRASTANTYO
author_sort RURIANDI (NIM : 13111072), HENDRASTANTYO
title Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
title_short Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
title_full Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
title_fullStr Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
title_full_unstemmed Assessment of Energy Efficiency of Combined Cycle Power Plant (Case Study: Combined Cycle Power Plant in Priok)
title_sort assessment of energy efficiency of combined cycle power plant (case study: combined cycle power plant in priok)
url https://digilib.itb.ac.id/gdl/view/22415
_version_ 1821120763627831296