OPTIMAL MANAGEMENT OF PLENGAN HIDROPOWER IN DAM SERI CIPANUNJANG-CILEUNCA BASE ON STOKASTIK DISKRIT MARKOV METHODE ON BANDUNG DISTRICT WEST JAVA
Nowadays, There is unbalance situation between clean water demand and supply due to growth of population and industry. Water resource management need to be led to create synergy and integrity between the cross-areas, cross-sector, and cross-generation. This thesis discusses about intake Cikalong as...
Saved in:
Main Author: | PRATAMA SARI (NIM : 25712301), IIN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22508 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CONTINUOUS MODEL OF WATER RESOURCES ON CIPANUNJANG-CILEUNCA RESEVOIR AND HYDROELECTRIC EXPLOITATION ON PLENGAN-LAMAJAN- CIKALONG FOR BANDUNG REGION WATER SUPPLY SYSTEM IN WEST JAVA PROVINCE
by: Fajriansah Basuki, Ari -
CILEUNCA FAMILY ECO-RESORT HOTEL
by: Widasari, Rahayu -
PEMODELAN STOKASTIK REGULASI GEN DALAM MERESPON
GRADED HYPOXIA DENGAN CONTINUOUS-TIME MARKOV CHAIN
by: , Putu Indah Ciptayani, et al.
Published: (2012) -
REFLECTING NATURE THROUGH BAMBOO BAMBOO EXPLORATION FOR LEISURE PARK ECOTOURISM DEVELOPMENT AT SITU CILEUNCA, BANDUNG, WEST JAVA
by: AGATTA (NIM : 15214044), JULLY -
PERSAMAAN DIFERENSIAL
STOKASTIK
by: SAIFUL ANAM, 089010780
Published: (1994)