DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)

The Batuceper Station and Poris Plawad Terminal are two public transportation facilities with the potential to be connected in the city of Tangerang. In accordance with the masterplans of both Tangerang city and PT. KAI 2020, the Batuceper Station and Poris Plawad Terminal will be connected into a s...

Full description

Saved in:
Bibliographic Details
Main Author: PUTERA, JONATHAN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22711
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22711
spelling id-itb.:227112017-12-05T13:27:45ZDESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION) PUTERA, JONATHAN Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22711 The Batuceper Station and Poris Plawad Terminal are two public transportation facilities with the potential to be connected in the city of Tangerang. In accordance with the masterplans of both Tangerang city and PT. KAI 2020, the Batuceper Station and Poris Plawad Terminal will be connected into a single integrated transportation district. The goal of the design study of the Intermodal Station at Poris Plawad Tangerang is to solve the problem of disconnected public transportation modes and to help relieve the traffic in Tangerang and Jakarta. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> The construction will take place above a thick layer of very soft clay soil. Soft clay soil tends to have a high degree of consolidation. Thus, soil improvement is required before construction to accelerate the consolidation process and improve soil shear strength. Analysis results show that the most suitable method of soil improvement is with preloading and prefabricated vertical drains (PVD). With the use of preloading, there will be an increase in effective stress on soil that will trigger the consolidation process. This process is accelerated by the PVD by shortening the drainage path so that the excess pore pressure will dissipate more quickly. Soil improvements with preloading and PVD was analyzed to accelerate the consolidation process into 5 months. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> The foundations of the station and hub are driven piles designed with the specifications of 600 mm in diameter and depths of 20 and 30 meters. The group pile configuration that are used are between 2 to 4 piles per group. The lateral deformation which occurs are between 1 to 19 mm for all the loading conditions. The group pile settlement ranges between 6 to 48 mm and all of them fulfills the requirement (<1/300) thus the design of tie beams is done using the minimum rebar requirements. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Batuceper Station and Poris Plawad Terminal are two public transportation facilities with the potential to be connected in the city of Tangerang. In accordance with the masterplans of both Tangerang city and PT. KAI 2020, the Batuceper Station and Poris Plawad Terminal will be connected into a single integrated transportation district. The goal of the design study of the Intermodal Station at Poris Plawad Tangerang is to solve the problem of disconnected public transportation modes and to help relieve the traffic in Tangerang and Jakarta. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> The construction will take place above a thick layer of very soft clay soil. Soft clay soil tends to have a high degree of consolidation. Thus, soil improvement is required before construction to accelerate the consolidation process and improve soil shear strength. Analysis results show that the most suitable method of soil improvement is with preloading and prefabricated vertical drains (PVD). With the use of preloading, there will be an increase in effective stress on soil that will trigger the consolidation process. This process is accelerated by the PVD by shortening the drainage path so that the excess pore pressure will dissipate more quickly. Soil improvements with preloading and PVD was analyzed to accelerate the consolidation process into 5 months. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> The foundations of the station and hub are driven piles designed with the specifications of 600 mm in diameter and depths of 20 and 30 meters. The group pile configuration that are used are between 2 to 4 piles per group. The lateral deformation which occurs are between 1 to 19 mm for all the loading conditions. The group pile settlement ranges between 6 to 48 mm and all of them fulfills the requirement (<1/300) thus the design of tie beams is done using the minimum rebar requirements.
format Final Project
author PUTERA, JONATHAN
spellingShingle PUTERA, JONATHAN
DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
author_facet PUTERA, JONATHAN
author_sort PUTERA, JONATHAN
title DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
title_short DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
title_full DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
title_fullStr DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
title_full_unstemmed DESIGN STUDY OF INTERMODAL STATION IN PORIS PLAWAD TANGERANG (SCOPE: GROUND IMPROVEMENT, FOUNDATION)
title_sort design study of intermodal station in poris plawad tangerang (scope: ground improvement, foundation)