#TITLE_ALTERNATIVE#
According to the strategic plan of the Ministry of Transportation in 2015-2019, the construction of railways is a priority that will be done in the period 2015-2019. One segment of the railway line of concern is the southern part of the Java railway line, the Cirebon-Kroya line. To create the path,...
Saved in:
Main Author: | SILVANUS (NIM : 12113012), KEVIN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22796 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: SILVANUS PANGGABEAN MANURUNG (NIM 12204049); Pembimbing : Dr. Ir. Leksono Mucharam, ADOLF -
#TITLE_ALTERNATIVE#
by: CHANNEL (NIM 12005032), KEVIN -
#TITLE_ALTERNATIVE#
by: BARLIAN (NIM. 15311071), KEVIN -
#TITLE_ALTERNATIVE#
by: TAMARA (NIM : 12213075), KEVIN -
#TITLE_ALTERNATIVE#
by: ANGRIAWAN PRATAMA (NIM : 12209094), KEVIN