REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG
Water is one of the important sanitation components for humans. Humans use clean water to meet their basic needs. Clean water utilized by the whole community needs to be reviewed aspects of quality, quantity and continuity so as not to cause negative impacts to human health and can meet their needs....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22839 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:22839 |
---|---|
spelling |
id-itb.:228392017-09-28T10:56:06ZREVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22839 Water is one of the important sanitation components for humans. Humans use clean water to meet their basic needs. Clean water utilized by the whole community needs to be reviewed aspects of quality, quantity and continuity so as not to cause negative impacts to human health and can meet their needs. Cikoneng Water Treatment Plant is one of the WTP that operates in the service of PDAM Tirta Raharja. Cikoneng IPA has a total production capacity of 400 L / s but, specifically for unit 3 of 150 L / s by serving 6 service areas of Ciparay, Baleendah, Bojongsoang, Dayeuhkolot, Pacet and Rancaekek subdistricts. Increasing public demand for clean water and the company's commitment to continuously improve its service capacity, the capacity of Cikoneng WTP needs to be increased by 664,4 L/s. Ciparay's SPAM development considers aspects of increasing the percentage of service areas, land demand and development costs under a four-stage development scenario of increasing the 100% capacity of all existing WTP and constructing a new WTP with a capacity of 265 L / s. The first phase was evaluated and redesigned at WTP 3 Cikoneng unit by increasing the processing capacity from 150 L/s to 300 L/s due to never been done on the WTP. The focus of the redesign is done on the filtration, reservoir, and disinfection units by adding units and modifying the hydraulic design as the chosen alternative. The redesign is done by adding 4 units of filter with dimensions adjusted to the existing condition that is 5,8 x 2,5 x 5,9 m, the replacement of filter media system into dual media filter (silica and anthracite sand) and modify the dimensions of the reservoir unit To 45 x 28,25 x 3,6 m and change the point of injection disinfection. The cost are required for these three units is Rp. 2.342.000.00,00. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Water is one of the important sanitation components for humans. Humans use clean water to meet their basic needs. Clean water utilized by the whole community needs to be reviewed aspects of quality, quantity and continuity so as not to cause negative impacts to human health and can meet their needs. Cikoneng Water Treatment Plant is one of the WTP that operates in the service of PDAM Tirta Raharja. Cikoneng IPA has a total production capacity of 400 L / s but, specifically for unit 3 of 150 L / s by serving 6 service areas of Ciparay, Baleendah, Bojongsoang, Dayeuhkolot, Pacet and Rancaekek subdistricts. Increasing public demand for clean water and the company's commitment to continuously improve its service capacity, the capacity of Cikoneng WTP needs to be increased by 664,4 L/s. Ciparay's SPAM development considers aspects of increasing the percentage of service areas, land demand and development costs under a four-stage development scenario of increasing the 100% capacity of all existing WTP and constructing a new WTP with a capacity of 265 L / s. The first phase was evaluated and redesigned at WTP 3 Cikoneng unit by increasing the processing capacity from 150 L/s to 300 L/s due to never been done on the WTP. The focus of the redesign is done on the filtration, reservoir, and disinfection units by adding units and modifying the hydraulic design as the chosen alternative. The redesign is done by adding 4 units of filter with dimensions adjusted to the existing condition that is 5,8 x 2,5 x 5,9 m, the replacement of filter media system into dual media filter (silica and anthracite sand) and modify the dimensions of the reservoir unit To 45 x 28,25 x 3,6 m and change the point of injection disinfection. The cost are required for these three units is Rp. 2.342.000.00,00. |
format |
Final Project |
author |
SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY |
spellingShingle |
SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
author_facet |
SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY |
author_sort |
SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY |
title |
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
title_short |
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
title_full |
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
title_fullStr |
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
title_full_unstemmed |
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG |
title_sort |
review and redesign of filtration, reservoir, and disinfection units at cikoneng water treatment plant unit 3 pdam tirta raharja kabupaten bandung |
url |
https://digilib.itb.ac.id/gdl/view/22839 |
_version_ |
1821120895655084032 |