#TITLE_ALTERNATIVE#
Cost is one of the most important part in project management. The way to calculate and determine cost in a project is by estimating. Cost estimating which is done by contractor can determine their winning or loss in a tender. But not only for tender, cost estimating is also done again to determine t...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22937 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Cost is one of the most important part in project management. The way to calculate and determine cost in a project is by estimating. Cost estimating which is done by contractor can determine their winning or loss in a tender. But not only for tender, cost estimating is also done again to determine the actual implementation cost. This Estimation is more detail than cost estimating for tender because all the calculations are done based on the actual needs on the field. Project implementation cost estimating is very crucial because cost estimating for tender is usually done for winning purpose only, so it is not fully accurate to be implemented on the field and there are still many components which have not been calculated nicely. On Center for Infrastructure and Built Environment (CIBE) ITB building project, there are modification on foundation into driven piles and on slab into half slab. Cost estimating is done with 4 steps which are designing the Work Breakdown Structure (WBS), quantity take off, direct cost analysis, and indirect cost analysis. From the result of the calculation, the total of direct cost is Rp 42.149.544.770,- and the total of indirect cost is Rp 4.214.954.477,-. From the total of direct cost, indirect cost, and tax, the total of project implementation cost is Rp 51.000.949.172,-. |
---|