BREAKWATER DESIGN WITH SOIL IMPROVEMENT OF BAMBOO PILE MATRASS AND PREFABRICATED VERTICAL DRAIN AND SLOPE STABILITY ANALYSIS BECAUSE OF EMBANKMENT IN RECLAMATION AREA NEW TANJUNG PRIOK PORT

The function of Breakwater in this project is to protect reclamation area that will be a terminal container and product in New Tanjung Priok Port. The type of breakwater is rubble mound consisting of three layer, armor with A-Jack material 2.5 ton, underlayer with gravel material 250 kg, and core...

Full description

Saved in:
Bibliographic Details
Main Author: OKTAVIANUS SIMBOLON, MIKHAEL
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/23072
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia