#TITLE_ALTERNATIVE#
Arcamanik Endah Housing Complex is one of the residential complex that located in the eastern part of Bandung City. This residential complex is located in <br /> <br /> Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031, Arcamanik District is directed to has...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23199 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:23199 |
---|---|
spelling |
id-itb.:231992017-09-27T10:25:16Z#TITLE_ALTERNATIVE# ARI RUWAEDI (NIM: 15309082), MUHAMMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23199 Arcamanik Endah Housing Complex is one of the residential complex that located in the eastern part of Bandung City. This residential complex is located in <br /> <br /> Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031, Arcamanik District is directed to has a function as housing or residental area. <br /> <br /> This residential complex needs some development and construction both in terms of human sources, administrative facilities and urban infrastructure. One of the infrastructure that is necessary to developed in this residential complex is Water Supply System (SPAM). Water sources for drinking water distribution system in <br /> <br /> Arcamanik Housing Complex currently using 4 drilled wells, but there only 3 drilled wells that can be used.All of the drill wells that still works is managed by PDAM Tirtawening Kota Bandung. The water from these drilled wells will be directed to water reservoir. Planning step is expected to fulfil the water needs for all of citizen in Arcamanik endak Complex by maximaze the drill well of PDAM Tirtawening. On the planning stage will be made some alternative distribution systems using 3 reservoir that the water sources are from the drilled wells. Planning is done with three alternatives of drinking water distribution network <br /> <br /> system which will be selected the best alternative taking into account the technical criteria for hydraulic, length of pipe and reservoir which is used, as well as economically viable. Planning is expected to meet drinking water needs in the <br /> <br /> area planning both in terms quantity and continuity. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Arcamanik Endah Housing Complex is one of the residential complex that located in the eastern part of Bandung City. This residential complex is located in <br />
<br />
Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031, Arcamanik District is directed to has a function as housing or residental area. <br />
<br />
This residential complex needs some development and construction both in terms of human sources, administrative facilities and urban infrastructure. One of the infrastructure that is necessary to developed in this residential complex is Water Supply System (SPAM). Water sources for drinking water distribution system in <br />
<br />
Arcamanik Housing Complex currently using 4 drilled wells, but there only 3 drilled wells that can be used.All of the drill wells that still works is managed by PDAM Tirtawening Kota Bandung. The water from these drilled wells will be directed to water reservoir. Planning step is expected to fulfil the water needs for all of citizen in Arcamanik endak Complex by maximaze the drill well of PDAM Tirtawening. On the planning stage will be made some alternative distribution systems using 3 reservoir that the water sources are from the drilled wells. Planning is done with three alternatives of drinking water distribution network <br />
<br />
system which will be selected the best alternative taking into account the technical criteria for hydraulic, length of pipe and reservoir which is used, as well as economically viable. Planning is expected to meet drinking water needs in the <br />
<br />
area planning both in terms quantity and continuity. |
format |
Final Project |
author |
ARI RUWAEDI (NIM: 15309082), MUHAMMAD |
spellingShingle |
ARI RUWAEDI (NIM: 15309082), MUHAMMAD #TITLE_ALTERNATIVE# |
author_facet |
ARI RUWAEDI (NIM: 15309082), MUHAMMAD |
author_sort |
ARI RUWAEDI (NIM: 15309082), MUHAMMAD |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/23199 |
_version_ |
1821121003176067072 |