Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport
Aircraft movement in Indonesia continues to increase each year, and this growth should be accommodated by all airports so that all the movement can be made. Accommodation should also be provided by Soekarno-Hatta Airport as the busiest airport in Indonesia. Based on the fact that the number of fligh...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23330 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:23330 |
---|---|
spelling |
id-itb.:233302017-09-28T14:48:05ZLanding System Simulation Design to Improve Capacity at Soekarno-Hatta Airport Rizki Rahmanda NIM 13413095 , Muhammad Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23330 Aircraft movement in Indonesia continues to increase each year, and this growth should be accommodated by all airports so that all the movement can be made. Accommodation should also be provided by Soekarno-Hatta Airport as the busiest airport in Indonesia. Based on the fact that the number of flight will increase in the future, it is necessary to increase the capacity at the airport to meet the demand. Planning to increase the capacity of the airport has been made by AirNav Indonesia, the runway operator in the airport, but still only in theory. Therefore, it is necessary to simulate the aircraft movement system at Soekarno-Hatta Airport, which includes its landing system, so that the value of the capacity can be seen clearly for each scenario. <br /> <br /> This study uses data related to the entire landing system at the airport, including the wind direction, the inter arrival time, destination, type, and speed of the aircraft as input data. Collected data is then entered to provide the detail in a simulation model created using Arena Simulation software. Results of the simulation are then combined with the aircraft departure simulation model so the Airport simulation as a whole can be created and can be used to assess the performance of the system. The performance criteria of the measured system are the number of takeoff and arrival processes that can occur in a single time and also the average queue time on the airport taxiway. <br /> <br /> Results of the current system are then compared with the proposed capacity improvement plan, such as using a different operation mode for the runway and the addition of road in the taxiway by looking at the queue of the existing system. From the comparison and analysis from the results, it can be seen that the airport capacity still can be improved by applying the solution design. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Aircraft movement in Indonesia continues to increase each year, and this growth should be accommodated by all airports so that all the movement can be made. Accommodation should also be provided by Soekarno-Hatta Airport as the busiest airport in Indonesia. Based on the fact that the number of flight will increase in the future, it is necessary to increase the capacity at the airport to meet the demand. Planning to increase the capacity of the airport has been made by AirNav Indonesia, the runway operator in the airport, but still only in theory. Therefore, it is necessary to simulate the aircraft movement system at Soekarno-Hatta Airport, which includes its landing system, so that the value of the capacity can be seen clearly for each scenario. <br />
<br />
This study uses data related to the entire landing system at the airport, including the wind direction, the inter arrival time, destination, type, and speed of the aircraft as input data. Collected data is then entered to provide the detail in a simulation model created using Arena Simulation software. Results of the simulation are then combined with the aircraft departure simulation model so the Airport simulation as a whole can be created and can be used to assess the performance of the system. The performance criteria of the measured system are the number of takeoff and arrival processes that can occur in a single time and also the average queue time on the airport taxiway. <br />
<br />
Results of the current system are then compared with the proposed capacity improvement plan, such as using a different operation mode for the runway and the addition of road in the taxiway by looking at the queue of the existing system. From the comparison and analysis from the results, it can be seen that the airport capacity still can be improved by applying the solution design. |
format |
Final Project |
author |
Rizki Rahmanda NIM 13413095 , Muhammad |
spellingShingle |
Rizki Rahmanda NIM 13413095 , Muhammad Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
author_facet |
Rizki Rahmanda NIM 13413095 , Muhammad |
author_sort |
Rizki Rahmanda NIM 13413095 , Muhammad |
title |
Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
title_short |
Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
title_full |
Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
title_fullStr |
Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
title_full_unstemmed |
Landing System Simulation Design to Improve Capacity at Soekarno-Hatta Airport |
title_sort |
landing system simulation design to improve capacity at soekarno-hatta airport |
url |
https://digilib.itb.ac.id/gdl/view/23330 |
_version_ |
1821121039349841920 |