DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION

In this planning is designed an intermodal station located in Joyoboyo, Surabaya. In this report will be planned the design of the bottom structure Joyoboyo intermodal station. With a plan that includes the design of the foundation and the retaining wall on the underpass. In the design of the founda...

Full description

Saved in:
Bibliographic Details
Main Author: BUDI PRAKOSO - NIM : 15013017 , NICO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23475
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23475
spelling id-itb.:234752017-09-27T14:36:27ZDESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION BUDI PRAKOSO - NIM : 15013017 , NICO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23475 In this planning is designed an intermodal station located in Joyoboyo, Surabaya. In this report will be planned the design of the bottom structure Joyoboyo intermodal station. With a plan that includes the design of the foundation and the retaining wall on the underpass. In the design of the foundation and retaining wall there are several necessary data, including soil data and structural load data. The data were analyzed as initial asset of foundation design calculation and retaining wall. Based on the calculation and analysis on the foundation design obtained the type of foundation is depth foundation which form a bored pile. The all diameter of the bored pile foundation is 800 mm with a depth of 33 meters for the foundation on the ground floor and 27.5 meters for the foundation on the underpass floor. The number of bored pile in a pile group has varying numbers, ie 1x2, 2x2, and 3x3 with 1 meter pile cap thickness. For lateral force checking used Group Pile software. For the calculation of foundation settlement, the overall pile group has qualify the maximum requirement of 15 cm. The reinforcement on the bored pile foundation used longitudinal reinforcement 16D22 and shear reinforcement D9-150. while on the pile cap used main reinforcement D19-150 and the upper press reinforcement D13-150. The retaining wall design uses PLAXIS 7.2 software. In the design of this retaining wall is used a wall which form a bored pile with 1500 mm diameter with ground anchor reinforcement as much as 2 layers with a spacing of 1 meter. The reinforcement of the bored pile wall is used 30D32 for longitudinal reinforcement and D13-150 for shear reinforcement. Keywords: foundation, foundation type, axial capacity, lateral capacity, pile group, foundation settlement, reinforcement, retaining wall, excavation, anchor, deflection permit. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In this planning is designed an intermodal station located in Joyoboyo, Surabaya. In this report will be planned the design of the bottom structure Joyoboyo intermodal station. With a plan that includes the design of the foundation and the retaining wall on the underpass. In the design of the foundation and retaining wall there are several necessary data, including soil data and structural load data. The data were analyzed as initial asset of foundation design calculation and retaining wall. Based on the calculation and analysis on the foundation design obtained the type of foundation is depth foundation which form a bored pile. The all diameter of the bored pile foundation is 800 mm with a depth of 33 meters for the foundation on the ground floor and 27.5 meters for the foundation on the underpass floor. The number of bored pile in a pile group has varying numbers, ie 1x2, 2x2, and 3x3 with 1 meter pile cap thickness. For lateral force checking used Group Pile software. For the calculation of foundation settlement, the overall pile group has qualify the maximum requirement of 15 cm. The reinforcement on the bored pile foundation used longitudinal reinforcement 16D22 and shear reinforcement D9-150. while on the pile cap used main reinforcement D19-150 and the upper press reinforcement D13-150. The retaining wall design uses PLAXIS 7.2 software. In the design of this retaining wall is used a wall which form a bored pile with 1500 mm diameter with ground anchor reinforcement as much as 2 layers with a spacing of 1 meter. The reinforcement of the bored pile wall is used 30D32 for longitudinal reinforcement and D13-150 for shear reinforcement. Keywords: foundation, foundation type, axial capacity, lateral capacity, pile group, foundation settlement, reinforcement, retaining wall, excavation, anchor, deflection permit. <br />
format Final Project
author BUDI PRAKOSO - NIM : 15013017 , NICO
spellingShingle BUDI PRAKOSO - NIM : 15013017 , NICO
DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
author_facet BUDI PRAKOSO - NIM : 15013017 , NICO
author_sort BUDI PRAKOSO - NIM : 15013017 , NICO
title DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
title_short DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
title_full DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
title_fullStr DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
title_full_unstemmed DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
title_sort design of foundation and retaining wall on the underpass of joyoboyo intermodal station
url https://digilib.itb.ac.id/gdl/view/23475
_version_ 1821121083910127616