IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT

Construction sector is one of the main pillars in the economic development of the world, including Indonesia. However, the number of accidents in the construction sector is still relatively high until now. 60 to 70 percent of occupational accidents in many employment sectors are caused by human erro...

Full description

Saved in:
Bibliographic Details
Main Author: Junianto (NIM: 25315020), Niko
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23491
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23491
spelling id-itb.:234912017-10-26T11:22:42Z IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT Junianto (NIM: 25315020), Niko Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23491 Construction sector is one of the main pillars in the economic development of the world, including Indonesia. However, the number of accidents in the construction sector is still relatively high until now. 60 to 70 percent of occupational accidents in many employment sectors are caused by human errors. A systematic analysis of the human error can be used to prevent accidents. Therefore, the analysis of human error is important to be implemented, particularly with regard to health and safety in the construction industry. The objectives of this study were to know the stages/ types of work with the greatest risk, to know the type of occupational accident with the highest HEP (human error probability), to know the main cause of human error occurred, as well as to know the implementation of health and safety in the project based on human error analysis performed. The methods used in this research were PSF (performance shaping factor)-based risk assessment and HEART (human error assessment and reduction technique). The primary data were obtained through interview, observation, and documentation. Secondary data needed were occupational accidents data and work procedures from the project health and safety expert. Based on the PSF-based risk assessment method, it was known that the type of work with the highest risk occurred in the installation of iron reinforcement by means of welding to steel columns or beams, from columns and beams work and concrete canopy work, with the risk value of 24 (of 24), which came from fall from height hazard. While the HEART method showed that the fall from height accident had the highest HEP value (4,75) among any other accidents. The main cause of the human error occurred in the project was the absence of complete written procedures for workers. Based on the analysis performed, it could be known that the company needed to improve the implementation of health and safety in the project, which could be done systematically, started from the employers, safety supervisor, and workers. <br /> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Construction sector is one of the main pillars in the economic development of the world, including Indonesia. However, the number of accidents in the construction sector is still relatively high until now. 60 to 70 percent of occupational accidents in many employment sectors are caused by human errors. A systematic analysis of the human error can be used to prevent accidents. Therefore, the analysis of human error is important to be implemented, particularly with regard to health and safety in the construction industry. The objectives of this study were to know the stages/ types of work with the greatest risk, to know the type of occupational accident with the highest HEP (human error probability), to know the main cause of human error occurred, as well as to know the implementation of health and safety in the project based on human error analysis performed. The methods used in this research were PSF (performance shaping factor)-based risk assessment and HEART (human error assessment and reduction technique). The primary data were obtained through interview, observation, and documentation. Secondary data needed were occupational accidents data and work procedures from the project health and safety expert. Based on the PSF-based risk assessment method, it was known that the type of work with the highest risk occurred in the installation of iron reinforcement by means of welding to steel columns or beams, from columns and beams work and concrete canopy work, with the risk value of 24 (of 24), which came from fall from height hazard. While the HEART method showed that the fall from height accident had the highest HEP value (4,75) among any other accidents. The main cause of the human error occurred in the project was the absence of complete written procedures for workers. Based on the analysis performed, it could be known that the company needed to improve the implementation of health and safety in the project, which could be done systematically, started from the employers, safety supervisor, and workers. <br /> <br />
format Theses
author Junianto (NIM: 25315020), Niko
spellingShingle Junianto (NIM: 25315020), Niko
IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
author_facet Junianto (NIM: 25315020), Niko
author_sort Junianto (NIM: 25315020), Niko
title IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
title_short IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
title_full IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
title_fullStr IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
title_full_unstemmed IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
title_sort implementation of performance shaping factor (psf)-based risk assessment and human error assessment and reduction technique (heart) at the itb student dormitory building c and d construction project
url https://digilib.itb.ac.id/gdl/view/23491
_version_ 1821121089064927232