#TITLE_ALTERNATIVE#

This final project will compare to simulation in order to calculate the leased line service cost for telecommunication provider in case of non-sharing tower and sharing tower (passive infrastructure sharing for microwave) between any other telecommunication provider. One of the methodes that use to...

Full description

Saved in:
Bibliographic Details
Main Author: SATRIA (NIM 13204160), NOVENRA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23533
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:This final project will compare to simulation in order to calculate the leased line service cost for telecommunication provider in case of non-sharing tower and sharing tower (passive infrastructure sharing for microwave) between any other telecommunication provider. One of the methodes that use to calculate the rate in basis of leased line service cost is Forward Looking Long Run Incremental Cost Plus (FLLRIC +) with Bottom-up approach. This calculation is based on capacity, kind of user, and the distance.<p> <br /> <br /> <br /> <br /> The experience result show that the efficiency in Capital Expanditure as the input parameter in costing the leased line rate by using tower sharing method can lowering the leased line rate. The Capex efficiency for local transmission is about 29,47% and long distance transmission is about 34,01%, where that efficiency can lowering the leased line rate for local transmission is about 11,2% and for long distance transmission is about 2 to 27 % depend on transmission distance.